0.08 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.23 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.24 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.46 miles
|
Cloud ParkInterested in this information?Contact us
|
|
|
0.47 miles
|
Core RidgeInterested in this information?Contact us
|
|
|
0.49 miles
|
PrimeInterested in this information?Contact us
|
|
|
0.52 miles
|
Valley PlusInterested in this information?Contact us
|
|
|
4.06 miles
|
OneInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.09 miles
|
Valley UltraInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.32 miles
|
ProInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.32 miles
|
Ridge ProInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.76 miles
|
Plaza GammaInterested in this information?Contact us
|
|
|
5.83 miles
|
Hub ThreeInterested in this information?Contact us
|
|
|
5.95 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
5.99 miles
|
EdgeInterested in this information?Contact us
|
|
|
6.78 miles
|
WestInterested in this information?Contact us
|
|
|
6.86 miles
|
West PointInterested in this information?Contact us
|
|
|
6.93 miles
|
CloudInterested in this information?Contact us
|
|
|
7.02 miles
|
Point OneInterested in this information?Contact us
|
|
|
7.32 miles
|
PrimeInterested in this information?Contact us
|
|
|
7.35 miles
|
CoreInterested in this information?Contact us
|
|
|
7.49 miles
|
Global RidgeInterested in this information?Contact us
|
The site started construction in 2012.
|
|
7.57 miles
|
Center OneInterested in this information?Contact us
|
|
|
7.59 miles
|
Campus MaxInterested in this information?Contact us
|
|
|
7.92 miles
|
South ParkInterested in this information?Contact us
|
|
|
7.95 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
8.10 miles
|
Core CampusInterested in this information?Contact us
|
|
|
8.12 miles
|
ThreeInterested in this information?Contact us
|
|
|
8.14 miles
|
MaxInterested in this information?Contact us
|
|
|
8.16 miles
|
North ParkInterested in this information?Contact us
|
|
|
15.90 miles
|
TowerInterested in this information?Contact us
|
|
|
16.00 miles
|
AlphaInterested in this information?Contact us
|
|
|
16.07 miles
|
MaxInterested in this information?Contact us
|
|
|
16.16 miles
|
Campus ProInterested in this information?Contact us
|
|
|
16.31 miles
|
North PointInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.35 miles
|
EdgeInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.36 miles
|
OneInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
16.38 miles
|
RidgeInterested in this information?Contact us
|
|
|
16.72 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.73 miles
|
Prime CampusInterested in this information?Contact us
|
|
|
16.74 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.75 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.77 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.06 miles
|
EdgeInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.07 miles
|
HubInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
17.17 miles
|
EastInterested in this information?Contact us
|
|
|
17.24 miles
|
Center OneInterested in this information?Contact us
|
|
|
17.25 miles
|
North StationInterested in this information?Contact us
|
|
|
17.31 miles
|
East CenterInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.31 miles
|
Valley GammaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.11 miles
|
Ridge ThreeInterested in this information?Contact us
|
|
|
18.26 miles
|
Valley OneInterested in this information?Contact us
|
|
|
18.28 miles
|
WestInterested in this information?Contact us
|
|
|
18.44 miles
|
Hub ThreeInterested in this information?Contact us
|
Construction started in 2012.
|
|
19.88 miles
|
CoreInterested in this information?Contact us
|
|
|
19.94 miles
|
PointInterested in this information?Contact us
|
|