0.10 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.22 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.23 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.46 miles
|
CenterInterested in this information?Contact us
|
|
|
0.46 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
0.47 miles
|
TwoInterested in this information?Contact us
|
|
|
0.51 miles
|
NorthInterested in this information?Contact us
|
|
|
4.11 miles
|
PlazaInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.12 miles
|
West TowerInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.35 miles
|
PrimeInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.36 miles
|
Core HubInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.57 miles
|
ParkInterested in this information?Contact us
|
|
|
5.63 miles
|
BetaInterested in this information?Contact us
|
|
|
5.75 miles
|
Ridge PlusInterested in this information?Contact us
|
|
|
5.79 miles
|
Station TwoInterested in this information?Contact us
|
|
|
6.56 miles
|
PrimeInterested in this information?Contact us
|
|
|
6.64 miles
|
Metro ParkInterested in this information?Contact us
|
|
|
6.71 miles
|
GlobalInterested in this information?Contact us
|
|
|
6.80 miles
|
East ParkInterested in this information?Contact us
|
|
|
7.09 miles
|
West CampusInterested in this information?Contact us
|
|
|
7.12 miles
|
Cloud CampusInterested in this information?Contact us
|
|
|
7.27 miles
|
Prime ParkInterested in this information?Contact us
|
The site started construction in 2012.
|
|
7.34 miles
|
Plaza OneInterested in this information?Contact us
|
|
|
7.37 miles
|
Metro StationInterested in this information?Contact us
|
|
|
7.69 miles
|
Valley ThreeInterested in this information?Contact us
|
|
|
7.73 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
7.89 miles
|
Station UltraInterested in this information?Contact us
|
|
|
7.90 miles
|
PlazaInterested in this information?Contact us
|
|
|
7.92 miles
|
Hub PrimeInterested in this information?Contact us
|
|
|
7.95 miles
|
ProInterested in this information?Contact us
|
|
|
15.86 miles
|
Central PointInterested in this information?Contact us
|
|
|
15.95 miles
|
StationInterested in this information?Contact us
|
|
|
16.03 miles
|
CoreInterested in this information?Contact us
|
|
|
16.12 miles
|
Tower PrimeInterested in this information?Contact us
|
|
|
16.26 miles
|
TowerInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.30 miles
|
Central StationInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.31 miles
|
Plaza GammaInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
16.32 miles
|
Tower GammaInterested in this information?Contact us
|
|
|
16.68 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.68 miles
|
Prime ValleyInterested in this information?Contact us
|
|
|
16.69 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.71 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.72 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.05 miles
|
NorthInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
17.05 miles
|
Plaza AlphaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.12 miles
|
NorthInterested in this information?Contact us
|
|
|
17.19 miles
|
ValleyInterested in this information?Contact us
|
|
|
17.20 miles
|
Park ThreeInterested in this information?Contact us
|
|
|
17.30 miles
|
ProInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.30 miles
|
CampusInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.08 miles
|
PointInterested in this information?Contact us
|
|
|
18.22 miles
|
SouthInterested in this information?Contact us
|
|
|
18.25 miles
|
MaxInterested in this information?Contact us
|
|
|
18.41 miles
|
Park ProInterested in this information?Contact us
|
Construction started in 2012.
|
|