░░░░░░░░░ Login to view SqFt Total Building Size
░░░░ Contact Us to subscribe to our data service MW Total Power
Show SqMOperated by: National Security Agency
The mammoth NSA data center, which cost some $1.7 billion, will allow the NSA to store more and, perhaps more importantly, keep data for much longer. At the time when it was under construction, the Utah facility was the Department of Defense’s largest ongoing construction project in the continental U.S. It was completed in 2014.
NSA chose the Bluffdale location because electricity is cheaper here, and land more easily available. The center will constantly use 65 megawatts of power -- enough to power 33,000 houses.
The site has (4) four 25,000 sqft data halls. Each data hall will have up to 18.75 megawatts of critical power.
Distance | Site | About |
---|---|---|
3.97 miles | DataBank SLC3 | |
4.02 miles | DataBank SLC6 |
|
4.02 miles | DataBank SLC2 |
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances. |
4.02 miles | DataBank Bluffdale Granite Point Campus |
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
|
4.09 miles | DataBank SLC4 | |
4.11 miles | DataBank SLC5 | |
4.53 miles | Edged Energy: Bluffdale, UT |
Two buildings are planned for the site
|
8.64 miles | Tract: Eagle Mountain, Utah |
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
|
8.80 miles | C7 Lindon (Timpanogos) | |
10.83 miles | Aligned SLC-03 |
|
10.94 miles | Aligned SLC-02 |
Aligned's SLC-02 Data Center is located in West Jordan, Utah. This is the second building of Aligned's Salt Lake City data center campus with 48MW capacity.
|
11.13 miles | Aligned Salt Lake City |
Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 34 MW of critical capacity.
|
11.13 miles | eBay South Jordan Topaz |
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
|
11.40 miles | XO: 8871 South Sandy | |
11.43 miles | Aligned: SLC05 | |
11.75 miles | Google: Eagle Mountain, Utah |
Google has purchased 300 acres of land for a future campus in Eagle Mountain. The land is located in the south of the city on Pony Express Parkway, across from Facebook’s data center.
|
11.90 miles | Novva South Jordan Campus |
|
11.98 miles | Facebook Eagle Mountain Utah |
The Facebook datacenter will be a 970,000 square foot building, located in northern Utah County, at the Sweetwater Industrial Park in Eagle Mountain, Utah.
|
12.24 miles | Cirrus DS View 78 |
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
|
12.75 miles | Flexential Salt Lake (Lindon) |
|
13.59 miles | Flexential Salt Lake (South View) |
|
15.10 miles | Voonami Orem SLC1 | |
15.85 miles | Flexential Salt Lake (Cottonwood) |
|
17.24 miles | Fibernet ORM1 |
|
18.28 miles | Flexential Salt Lake (Mill Creek) |
|