Ada Infrastructure launches second Tokyo campus
May 31, 2024
Ada Infrastructure
Ada Infrastructure's Rio de Janeiro campus will consist of 3 single-story turnkey high-density data center buildings.
| Distance | Site | About |
|---|---|---|
| 9.23 miles | Ascenty Rio de Janeiro | |
| 9.43 miles | CloudHQ: Rio GIG 1 |
CloudHQ’s GIG Campus, the company's second data center development in Brazil, is located in São João de Meriti, 18 km (11 miles) from the metropolitan region of Rio de Janeiro.
|
| 9.43 miles | Equinix: RJ3 |
|
| 9.82 miles | Scala: Rio de Janeiro SGIGSM01 |
SM01 is a modular hyperscale-focused site made by individualized MW modules. Each module can be built with specific topology.
|
| 9.87 miles | ODATA RJ-01 | |
| 11.60 miles | Equinix Rio RJ2 |
|
| 13.75 miles | Cirion Rio de Janeiro |
|
| 14.40 miles | Carrier-Neutral Data Center Request Dataset | |
| 14.42 miles | Tecto: Rio CLS |
Tecto operates a 1,600 m² cable landing station in Rio de Janeiro, Brazil.
|
| 17.35 miles | Equinix Rio RJ1 |
|
Founded in 2023 by GLP, an APAC real estate firm, Ada Infrastructure is an data center company.
Currently, Ada Infrastructure is building seven active campuses located in Japan, the UK, and Brazil, with a total power capacity of over 850 MW and an additional 1,500 MW projected in their global expansion plans.
May 31, 2024
Ada Infrastructure
September 25, 2023
Ada Infrastructure
September 22, 2023
Ada Infrastructure
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas