Verne: Helsinki (The Air)

Latest Podcast
Mittalinja 1
OperationalPlanned
Operational with future phases planned
Operated by:

Verne: Helsinki (The Air)

Year Built: 2019
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

Verne, the leading provider of sustainably powered HPC data centers across the Nordics, has acquired the land at its existing Helsinki data center campus, securing room for future expansion. Verne acquired its Helsinki data center in 2022 as part of the Ficolo acquisition.

  • In 2024, Investment firm Ardian completed the acquisition of European data center firm Verne from UK infrastructure firm Digital 9 Infrastructure plc (D9).

Power


  • 100% renewable energy (wind)
  • Two separate 20kV fees
  • Diverse power routes
  • Cell-based design (UPS, Generator), N+1 redundancy

Map and Nearby Locations:

Mittalinja 1
Verne Global Sites
Nearby Facilities

Sites within 15 miles of Verne: Helsinki (The Air)

Distance Site About
3.68 miles Hetzner Finland
The entire site is 150,000 m², making it spacious enough to accommodate 20 data centers.
7.01 miles Equinix Helsinki HE5
9.08 miles Edgnex: Vantaa
In 2025, Edgnex expanded its presence in Finland by acquiring data center developer Hyperco.
9.11 miles Equinix Helsinki HE4
9.13 miles atNorth: FIN01
FIN01 is located in the Vallila area of Helsinki with a gross space of 1,200 sqm.
9.21 miles Digita Pasila Broadcasting Tower
9.28 miles Elisa Helsinki Pasila
9.33 miles Equinix Helsinki HE3
9.63 miles Telia Pitäjänmäki (Nebula Oy)
The facility was acquired by Telia when it acquired Nebula Oy in 2017.
9.76 miles Telia Helsinki Pitäjänmäki
The site is powered by 100 percent renewable energy and will recycle waste heat from the servers, producing 200,000 MWh per year - enough heat to supply 20,000 homes in the nearby town of Espoo.
9.79 miles Mediam Helsiki Data Center
9.79 miles Equinix Helsinki HE1
10.49 miles Equinix Helsinki HE2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
11.01 miles Telia Helsinki Kansakoulukuja
11.76 miles Elisa Espoo Säterinportti
12.76 miles Telia Lauttasaari (Nebula Oy)
The facility was acquired by Telia when it acquired Nebula Oy in 2017.
12.78 miles Elisa Helsinki Lauttasaari
12.83 miles IP-Only Espoo
12.84 miles DataCenter Finland Espoo
12.84 miles Technopolis Innopoli
13.08 miles Equinix Helsinki HE6
13.11 miles Equinix Helsinki HE7 Sinimäki
13.25 miles atNorth: FIN02
Located in Sinimäentie, Espoo, within the Helsinki metropolitan area, the new campus spans 23,000 square meters at full buildout. The initial phase of FIN02 offers 2,196 square meters of white space.
13.51 miles Elisa Espoo Tapiola
13.55 miles atNorth: FIN03
FIN03 is located in Espoo with a gross space of 1,200 sqm.
13.71 miles Hyperco: Espoo
Hyperco, a Nordic data center firm, is eyeing a significant expansion with plans to construct a new campus in Espoo, Finland, a municipality adjacent to Helsinki.
13.97 miles Prime: Järvenpää, Finland
US-based operator Prime Data Centers has announced plans for a significant expansion into Finland, targeting a 12-hectare site in the Vähänummi industrial area of Järvenpää.
14.57 miles DayOne: Nurmijärvi
Singapore-based developer DayOne announced plans for a large-scale data center campus in the Sudentulli area of Klaukkala, located within the municipality of Nurmijärvi in the Uusimaa region of Finland.
14.84 miles Hyperscale Data Center Request Dataset
A Microsoft data center campus is being built in Högnäs, Espoo, on 21.6 hectares of land acquired by Microsoft for €30.9 million.

Verne: Helsinki (The Air) Data Center Photos (See all)

Ficolo The Air has a kinetic facade that moves with the air flows.
Ficolo The Air - kinetic facade
Source: Baxtel

Ficolo The Air has a kinetic facade that moves with the air flows.

Racks in The Air data center
Data center racks in The Air
Source: Baxtel

Racks in The Air data center

Operating Company

Operated by:

Using 100% renewable energy, Verne Global delivers true high performance computing solutions in an optimised environment.

7
Facilities
0
Markets
66MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?