Year Planned: 2030
Utility Provider: MEAG Power
Floors: 1
Lot Size: 562 acres

Thor Equities plans to develop the Kingston Technology Hub on a 559-acre site in Kingston, Bartow County, Georgia. The project will comprise a single data center building and associated electrical infrastructure, including a planned on-site substation. Thor is pursuing electricity supply through MEAG Power and intends to use a closed-loop cooling system designed to minimize water consumption.

Map and Nearby Locations

This Facility
Thor Equities Group Sites
Nearby Facilities

Thor Equities: Kingston Technology Hub Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Thor Equities: Kingston Technology Hub

Distance Site About
5.07 miles Project Springbank
Project Springbank envisions a six-building data center campus spanning a total of 2.274 million square feet (211,260 square meters).
5.86 miles James Freeman Investments: Gaines Road
6.53 miles DataBank: Project Indo
US operator DataBank is planning to develop Project Indo, a massive 1.1 million square foot data center campus on 69 acres in Cartersville, Georgia, roughly 42 miles northwest of downtown Atlanta.
10.47 miles Digital Realty: Bunkhouse Expansion
10.64 miles Digital Realty: Project Bunkhouse
Engineering services firm Kimley-Horn is planning a large data center campus, referred to as Project Bunkhouse, outside Atlanta, Georgia.
11.40 miles Project Sassy
Atlas Development LLC is proposing a data center campus in Rome, Georgia, seeking to rezone a 178-acre site between Plainville Road and Ga. 53 from suburban residential to heavy industrial.
11.42 miles Project Sassy Expansion
11.60 miles Switch: KEEP 2.0 Atlanta North
Switch's second Georgia campus: a $772 million, 126-acre data center development in Cartersville. Phase 1 came online in Q2 2026, with phased buildout continuing through 2046.

Thor Equities: Kingston Technology Hub Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

Thor Equities is a leader in the development, leasing and management of office, industrial, laboratory, residential, hotel and mixed-use assets in premier urban locations worldwide. The company operates in major cities around the globe and has a property portfolio totaling $20 billion with a development pipeline in excess of 50 million square feet. Thor has a strong presence on three continents and in addition to its US holdings, the company has assets in European gateway cities including London, Paris, Madrid, and Milan, and is the largest developer in Mexico through its Latin American division with a development pipeline of over 18 million square feet. Thor maximizes returns for institutional investors by recognizing a property’s potential, reducing operating expenses, increasing tenant satisfaction, leveraging market trends to maintain a long-term competitive edge. For more information, visit www.thorequities.com.

0
Facilities
0
Markets

News See all

Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Thor Equities Plans 150MW Data Center In Georgia, US
Real estate investment firm Thor Equities has submitted plans for a 150MW data center in Kingston, Bartow County, Georgia. Filed through Thor Acquisitions WC LLC, the $1 billion project is targeted...

Thor Equities Plans 150MW Data Center In Georgia, US

September 14, 2026 Thor Equities Group

Real estate investment firm Thor Equities has submitted plans for a 150MW data center in Kingston, Bartow County, Georgia. Filed through Thor Acquisitions WC LLC, the $1 billion project is targeted for completion in 2030. Dubbed the Kingston Technology Hub, the project is expected to generate...

Read more
Read Thor Equities Plans 460,000 Sq ft Data Center Near Urbana
Thor Equities Plans 460,000 Sq ft Data Center Near Urbana

Thor Equities Plans 460,000 Sq ft Data Center Near Urbana

April 23, 2026 Thor Equities Group

Real estate firm Thor Equities is looking to build a 460,000 sq ft (42,735 sqm) data center campus near the city of Urbana in western Ohio. Urbana residents began speculating about a potential data center proposal after a local newspaper reported that Thor Equities had bought a 47.6-acre land...

Read more
Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read Atlanta City Council members propose new bill to block data center developments
Atlanta City Council members propose new bill to block data center developments

Atlanta City Council members propose new bill to block data center developments

May 10, 2024 Atlanta

Atlanta City Councilmen Jason Dozier and Matt Westmoreland have introduced bills to block data center developments around certain areas of the Georgia city near transit stops and the Beltline. “Excited to introduce legislation alongside Matt Westmoreland to address the rapid growth of data...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?