Hub PrimeInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Lackenby Main Office, Middlesbrough TS6 7RP, United Kingdom
Planned
Future facility in planning stage
Operated by:

Teesworks AI Data Center

Year Planned: 2028
Floors: 2

Sites on this Campus:

A large data center is set for Teesside, UK, after receiving outline planning permission from the Redcar and Cleveland Council. The approval comes despite objections from BP, which claims the project will obstruct its plans for a nearby hydrogen plant.

The proposed 500,000-square-meter campus is a project by Teesworks Ltd, the public-private partnership transforming a 4,500-acre former steelworks site into Europe’s largest brownfield regeneration project. Tech giant Google is reportedly in talks to occupy the development, which is planned to include six two-story data halls. While this initial permit is a major milestone, a detailed "reserved matters" application is still required before construction begins.

BP’s competing interest for the site involves H2 Teesside, a blue hydrogen plant. This technology produces fuel from natural gas while capturing carbon emissions, classifying it as a low-carbon energy source.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Prime PlazaInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of North PlazaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Core HubInterested in this information?Contact us
NN milesInterested in this information?Contact us Wilton DC2
This Building is a part of Wilton Data Centre Campus. DC building (DC Building 2) would have a building footprint of 47,250 sqm (508,600 sq ft).
NN milesInterested in this information?Contact us Wilton Data Center Campus
Wilton Data Centre is building a data center complex on a 32-acre plot at the Wilton International Park outside Middlesbrough in North Yorkshire.
NN milesInterested in this information?Contact us Level3 Middlesbrough
NN milesInterested in this information?Contact us DXC: Wynyard Park Billingham
The DXC Wynyard Data Center, often called the "Northern Data Center," is a massive 360,000 sq. ft. facility in Stockton-on-Tees that stands as a landmark of sustainable engineering.
NN milesInterested in this information?Contact us Latos: Stockton DC02
The development, situated on a 1.85-acre vacant site within the Preston Farm Industrial Estate, will comprise two buildings (DC 01 and 02) totaling 1,725 sqm (18,595 sq ft).
NN milesInterested in this information?Contact us Latos: Stockton DC01
UK data center firm Latos is planning a new "Neura Data Centre" campus in Stockton-on-Tees, just outside Middlesbrough.
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
Carrier-Neutral Operator is building a data center in Darlington, UK.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read Google-Backed Texas Battery Pilot Improves Carbon-Free Data Center Matching
A three-month Google-sponsored battery storage pilot in Texas has shown how BESS can improve hourly carbon-free energy matching for data centers. The pilot, led by Quintrace, esVolta, and LevelTen ...

Google-Backed Texas Battery Pilot Improves Carbon-Free Data Center Matching

September 23, 2026 Google

A three-month Google-sponsored battery storage pilot in Texas has shown how BESS can improve hourly carbon-free energy matching for data centers. The pilot, led by Quintrace, esVolta, and LevelTen Energy, used batteries to store surplus renewable energy and discharge it during periods of higher...

Read more
Read Google Explores Data Center Development In New Mexico
Google is exploring a new data center project in Lea County, New Mexico.
The company has not disclosed further details, including the site location or facility specifications.

“Though many deta...

Google Explores Data Center Development In New Mexico

September 19, 2026 Google

Google is exploring a new data center project in Lea County, New Mexico. The company has not disclosed further details, including the site location or facility specifications. “Though many details remain outstanding, we’re excited about the possibilities that exist in Lea County, and look forward...

Read more
Read Google And Blackstone JV Faces Delays On Data Center Projects
Google and Blackstone’s joint venture is facing delays at several data center projects across the US, although the partnership remains optimistic about its progress. Known internally as Project Bra...

Google And Blackstone JV Faces Delays On Data Center Projects

September 09, 2026 Google

Google and Blackstone’s joint venture is facing delays at several data center projects across the US, although the partnership remains optimistic about its progress. Known internally as Project Braid, the JV was formed in May 2026 to develop a cloud platform powered by Google’s Tensor Processing...

Read more
Read Google Reveals It Is Behind 506-Acre Project Clydesdale Data Center In Oklahoma
Google has confirmed it is behind the Project Clydesdale data center campus near Tulsa, Oklahoma. Developed by Beale Infrastructure, the 506-acre campus will be located near the Cherokee Industrial...

Google Reveals It Is Behind 506-Acre Project Clydesdale Data Center In Oklahoma

August 19, 2026 Google

Google has confirmed it is behind the Project Clydesdale data center campus near Tulsa, Oklahoma. Developed by Beale Infrastructure, the 506-acre campus will be located near the Cherokee Industrial Park in Owasso. “The Tulsa Regional Chamber is thrilled that Google is deepening its footprint in...

Read more
Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?