T5@Atlanta I

Latest Podcast 3200 Webb Bridge Road in Alpharetta
Operational
Fully operational facility
Operated by:

T5@Atlanta I

Year Built: 2011
PUE: 1.2
Utility Provider: Georgia Power
Floors: 1
Lot Size: 80 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

T5 Data Centers established its first metro Atlanta facility in Alpharetta in 2011. Stack acquired the Alpharetta facility in 2019 from data center operator T5.

Map and Nearby Locations

3200 Webb Bridge Road in Alpharetta
T5 Data Centers Sites
Nearby Facilities

T5@Atlanta I Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of T5@Atlanta I

Distance Site About
0.03 miles STACK Atlanta ATL01
The site was previously known as T5@Atlanta
0.14 miles Stack: ATL01 Future Expansion
STACK Infrastructure is constructing a new data center facility neighboring ATL01A, at Webb Bridge Rd, Alpharetta, GA, with a substantial footprint of 133000 square feet.
0.74 miles Real Estate Data Center Request Dataset
Lincoln Property Company purpose-built turnkey data center in the Atlanta metro (Alpharetta). 7.3 MW critical (N+1) available, with a path to 46+ MW. Offered for lease.
0.96 miles 356 Alpharetta
Purpose-built 1999 as SunGard ATL-11650 (single-tenant from inception); 77,300 sqft / 4.3 MW. Building sold 2021 to Mapletree Industrial Trust ($27M); 365 leases.
1.02 miles Apotech: Atlanta 1
Operational Tier III colocation in Alpharetta (greater Atlanta): 88,000 sq ft, 11 MW utility capacity, 3.75 MW critical IT, served by two Georgia Power substations.
1.07 miles Flexential Atlanta-Alpharetta
Flexential's Alpharetta site is a former Peak 10 facility.
1.38 miles GI Partners: Alpharetta
This was a former Lincoln Rackhouse facility. In 2025, GI Partners paid $253M for 4905 North Point Parkway, a 185K SF data center, from Lincoln Rackhouse and Principal Asset Management.
2.14 miles Strategic Datasphere: Alpharetta, Georgia
Strategic Datasphere has completed the acquisition of a Tier IV equivalent data center located in Alpharetta, GA. The 165,000 square foot state-of-the-art facility has 5.4 MW of 2N critical capacity that can be expanded to 8.1 MW at N+1.
2.15 miles Mapletree: 1001 Windward
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
9.17 miles Flexential Atlanta-Norcross 2
Flexential plans to expand its Atlanta presence through development of Atlanta – Norcross 2 at 2755 Northwoods Parkway in Norcross, Georgia. The project extends the company’s existing Norcross footprint and is designed to support enterprise and AI workloads with a targeted launch in the first half of 2028.
9.17 miles Flexential Atlanta-Norcross
The Norcross data center features a cloud node on-site.
9.73 miles Equinix Atlanta AT5
Another site Equinix acquired from Verizon.
10.89 miles Internap Atlanta: 40 Perimeter Center
In 2017, Internap (NASDAQ:INAP), a global provider of dedicated servers, hybrid cloud, colocation, and managed services, signed a long-term lease for a "Tier 3-like" data center.
10.89 miles 40 Perimeter Center: Lincoln Rackhouse
The data center is 30 minutes from Hartsfield International Airport and 20 minutes from downtown Atlanta.
11.18 miles Crypto Mining Data Center Request Dataset
An 87,000-square-foot data center in Norcross was purchased and transformed into CleanSpark’s second Bitcoin mining facility
11.71 miles Lumen Doraville 1
11.83 miles Server Farm Atlanta
Server Farm Atlanta at 305 Satellite Blvd was a former AMD data center originally commissioned in 2012 and designed to accommodate approximately 100,000 SF of additional data center space.
12.00 miles QTS Atlanta Suwanee
The QTS Atlanta-Suwanee 1 DC1 has 385,000 sq. ft. of data center and office space in the north suburbs of Atlanta
12.16 miles QTS: Suwanee 1 DC2
In 2023, QTS acquired its second data center to expand to a Suwanee campus.
16.15 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
16.47 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
17.24 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
17.39 miles Grindcap: Marietta 2
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
17.44 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
17.46 miles Grindcap: Marietta Campus
Grindcap plans to construct a 347,200 sq ft (32,255 sqm) campus featuring two two-story data center buildings (DC-1 at 213,600 sq ft and DC-2 at 133,600 sq ft) and a substation

T5@Atlanta I Data Center Photos See all

The first building's data hall layout
Source: T5
Campus Plan
Source: T5
Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

T5 Data Centers, an Atlanta-based data center provider that specializes in offering wholesale data center space. T5 has data centers in Atlanta, Charlotte, Colorado, Dallas, Los Angeles, and New York markets

17
Facilities
8
Markets

News See all

Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read Bitfarms and T5 to Develop Data Center in Pennsylvania
Bitfarms and T5 to Develop Data Center in Pennsylvania

Bitfarms and T5 to Develop Data Center in Pennsylvania

August 06, 2025 T5 Data Centers

Bitfarms, a cryptomining company pivoting to AI and HPC data centers, this week announced its partnership with T5 Data Centers to “advance HPC/AI development” at its Panther Creek campus in the state.The partnership will focus on pre-construction, design, planning, and development approval...

Read more
Read T5 Data Centers acquires land outside Atlanta for a new data center campus
T5 Data Centers acquires land outside Atlanta for a new data center campus

T5 Data Centers acquires land outside Atlanta for a new data center campus

August 31, 2024 T5 Data Centers

T5 Data Centers this week announced plans to expand its Atlanta footprint with the development of a new data center campus in South Fulton County known as ATL IV. The company has already acquired land outside Atlanta, Georgia, a 91-acre site in Palmetto already zoned for data center use and...

Read more
Read Atlanta City Council members propose new bill to block data center developments
Atlanta City Council members propose new bill to block data center developments

Atlanta City Council members propose new bill to block data center developments

May 10, 2024 Atlanta

Atlanta City Councilmen Jason Dozier and Matt Westmoreland have introduced bills to block data center developments around certain areas of the Georgia city near transit stops and the Beltline. “Excited to introduce legislation alongside Matt Westmoreland to address the rapid growth of data...

Read more
Read T5 to develop new data center campus in Illinois
T5 to develop new data center campus in Illinois

T5 to develop new data center campus in Illinois

May 04, 2024 T5 Data Centers

T5 Data Centers recently revealed its plans to develop a new data center campus in Grayslake, Illinois as it announced that the 160-acre site, 40 miles north of Chicago, will be used for “multiple data center buildings.” “The new Grayslake campus represents a major investment by T5 to meet the...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?