Carrier-Neutral Data CenterInterested in this information?Contact us

Latest Podcast 1 Superloop Circle
Operational
Fully operational facility
Operated by:

Carrier-Neutral Data Center

Year Built: 2017
Lot Size: 2,000 acres

Sites on this Campus:

  • Carrier-Neutral Data CenterInterested in this information?Contact us
  • Carrier-Neutral Data CenterInterested in this information?Contact us
  • Carrier-Neutral Data CenterInterested in this information?Contact us
  • Carrier-Neutral Data CenterInterested in this information?Contact us
  • Carrier-Neutral Data CenterInterested in this information?Contact us
  • Carrier-Neutral Data CenterInterested in this information?Contact us
  • Carrier-Neutral Data CenterInterested in this information?Contact us
░░░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░░ Request Dataset MW
Total Power

The Switch Tahoe Reno site is also known as the Citadel Campus. The facility is located in the same industrial park as Tesla Motors' Gigafactory

Power

4.9¢ per kWh, 100% green power
100% power uptime guarantee
Up to 55kW per cabinet

Taxes

2% sales and use tax in Nevada
75% reduction in personal property tax in Nevada
No personal state income tax in Nevada
U.S. approved ‘Qualified Opportunity Zone’

Solar Power

Switch Station 1 and Switch Station 2 power plants commissioned in December 2017 at the Apex Industrial Park are designed to generate 179 megawatts, enough electricity to meet the needs of 46,000 homes. The solar plants serve Switch facilities in Reno and Las Vegas.

Tahoe Reno 1

Tahoe Reno 1, the first building on the campus, is 1.3 million square feet and can support up to 130 MW of power. Switch’s design for the 2,000 acre campus calls for up to 7.2 million square feet.

Map and Nearby Locations

1 Superloop Circle
Switch Sites
Nearby Facilities

Carrier-Neutral Data CenterInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Carrier-Neutral Data CenterInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
NN milesInterested in this information?Contact us EdgeCore Reno
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
NN milesInterested in this information?Contact us Colovore: Reno, NV
Colovore's liquid-cooled colocation data center is located in Reno, Nevada.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

0
Facilities
0
Markets

News See all

Read Switch Files Plans For Data Center Campus At Former Pittsburgh Race Track
Switch has filed plans for a new three-building data center campus in Big Beaver Borough, near Pittsburgh, Pennsylvania. The proposed Big Beaver Data Center/Switch Pit 01-03 will feature three faci...

Switch Files Plans For Data Center Campus At Former Pittsburgh Race Track

August 24, 2026 Switch

Switch has filed plans for a new three-building data center campus in Big Beaver Borough, near Pittsburgh, Pennsylvania. The proposed Big Beaver Data Center/Switch Pit 01-03 will feature three facilities, each covering 201,690 sq ft (18,737 sqm). Planning documents indicate a combined backup...

Read more
Read Iron County, Utah Data Center Proposal Gets Green Light
Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4.

The...

Iron County, Utah Data Center Proposal Gets Green Light

June 13, 2026 Switch

Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4. The Antelope Data Center campus will include five buildings totaling around 1.35 million sq ft (125,000...

Read more
Read Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion
Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3...

Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion

June 10, 2026 Switch

Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3.5 billion syndicated uncommitted performance letter of credit facility (LCF). In April, Switch...

Read more
Read Centra Completes Structural Topping out of Reno Data Center
Centra Completes Structural Topping out of Reno Data Center

Centra Completes Structural Topping out of Reno Data Center

May 04, 2026 Reno

US data center firm Centra has topped out a new facility in Reno, Nevada. "We've officially topped out RNO2, our second Reno facility and the region's first carrier-neutral interconnection data center,” the company said on LinkedIn. “This moment represents our significant progress toward...

Read more
Read Switch Plans New Data Center Campus Near Pittsburgh
Switch Plans New Data Center Campus Near Pittsburgh

Switch Plans New Data Center Campus Near Pittsburgh

May 01, 2026 Switch

US data center firm Switch is planning a new campus outside Pittsburgh, Pennsylvania. The company this week announced plans for a 382-acre development in Big Beaver Borough, Beaver County. The site is located around 40 miles (64km) northwest of Pittsburgh, near the Ohio state border. Full details...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents

Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024

Ready to Level up Your
Data Center Strategy?