Kati 2 is the AI phase of Soluna's Project Kati, next to the Kati 1 bitcoin hosting site in Willacy County. Soluna manages the project through a joint venture with Metrobloks, formed in June 2026, and Metrobloks leads the design. Phase I sits on land the venture already owns, and Phase II will follow on land it plans to buy.
The campus draws power behind the meter from the Las Majadas wind farm, with a second feed from the ERCOT grid and on-site generation for backup. It targets high-density AI racks with air, liquid-to-the-chip or hybrid cooling and no chillers. It sits under 40 miles from McAllen's main cross-border network hub.
Site History
- In October 2026, Soluna registered a $472 million Phase I data center building with the state.
- In September 2026, ERCOT conditionally classified the full Kati campus as base load in its first large-load batch.
- In June 2026, Soluna and Metrobloks formed a joint venture to develop the campus.