Princeton Nurseries Data Center

Planned
Future facility in planning stage
Operated by: Unknown Company

Princeton Nurseries Data Center

Year Planned: 2028

The owner of the Princeton Nurseries site in New Jersey is seeking to develop a 340,985 sq ft (31,678 sqm) data center. This data center is part of a larger redevelopment plan for the 160-acre plot.

WRV Nurseries South Brunswick LLC has submitted an application for the data center, which includes plans for parking and other necessary facilities. If approved, the data center will be situated within the OC Office Corporate Zone of the Princeton Nurseries Redevelopment Area.

Map and Nearby Locations

4405 US-1
Unknown Company Sites
Nearby Facilities

Princeton Nurseries Data Center Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Princeton Nurseries Data Center

Distance Site About
1.04 miles DataBridge: Princeton NJ
AGILE Princeton is conveniently located, 45 minutes via car or train from both New York & Philadelphia and just 5 miles from the Princeton Junction train station.
2.37 miles Lumen South Brunswick 1
6.46 miles QTS: East Windsor 1 DC2
The proposed expansion in East Windsor involves a $600 million investment by QTS Data Centers to build a second, state-of-the-art facility on its existing Princeton-Hightstown Road campus.
6.59 miles QTS: East Windsor 1 DC1
QTS is expanding its data center campus in Princeton, New Jersey. The first phase of the project was topped off in November, 2024.
12.40 miles BNY Mellon Somerset
12.60 miles CyrusOne Somerset
Phase 1 is 50,000 gross sqft at full build out the facility will have 330,00 gross sqft. The total building's sqft is 430,000sqft and sits on 22.5 acres
12.78 miles Morgan Stanley Somerset
12.90 miles Rackspace: Somerset NYC2
12.90 miles Rackspace Belmont NYC2
13.13 miles Rackspace Somerset NYC1
1.2 MW UPS Power Capacity N+N Redundancy
13.87 miles Chirisa: Piscataway
Chirisa Technology Parks (CTP) is growing its New Jersey data center footprint. The company has purchased a substantial property in Piscataway, with plans to develop a major data center facility starting in 2024.
13.92 miles Digital Fortress Piscataway
14.51 miles Verizon Wireless Branchburg
14.87 miles QTS: Piscataway 2
QTS planned for the expansion in 2022 with Additional 2 story, 50,000 sq. ft of space.
14.93 miles QTS Piscataway
The site was acquired from Dupont Fabros in June 2016 for $125 million. It was previously known as "DuPont Fabros NJ1" when owned by Dupont.
15.08 miles DataBank Piscataway EWR2
15.18 miles Open Data Centers Piscataway
15.22 miles 365 S Randolphville - Digital Realty
15.22 miles Centersquare: Piscataway EWR3-B
The Piscataway facility was formerly known as NJ4.
15.31 miles 365 Bridgewater NJ
The New Jersey facility is located in Bridgewater, NJ, just 40 miles west of New York City along the fiber-rich “Magic Mile.” The 25,565-square-foot data center offers 2.3MW of capacity.
15.35 miles 1115 Centennial Ave: Digital Realty
15.43 miles Centersquare: Piscataway EWR3-A
15.43 miles 3 Corporate - Digital Realty
3 Corporate Place contains approximately 135,000 square feet of state-of-the-art data center space and 25,000 square feet of office space. It offers 26 MW of utility power capacity.
16.14 miles Hyperscale Data Center Request Dataset
The planned facility, spanning 1 million square feet (92,905 square meters), will be operated as a data center by a tenant rather than by the property's owner, NorthPoint Development.
16.14 miles Northpoint: Keystone Trade Campus
NorthPoint Development has received approval to build a 2 million-square-foot data center campus within its Keystone Trade Center in Bucks County.
17.43 miles LexusNexis Edison NJ
17.43 miles Iron Mountain New Jersey
Iron Mountain's site is in Edison, NJ. Iron Mountian acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 IO sites
18.25 miles Keystone NAP
Keystone’s facility is a repurposed former steel mill, which was converted into a data center building, was once the largest vertically integrated steel production site in the U.S.

Princeton Nurseries Data Center Data Center Photos See all

Operating Company

Operated by: Unknown Company
75
Facilities
43
Markets

News See all

Read New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff
New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other rate...

New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff

July 03, 2026 New Jersey

New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other ratepayers from rising costs linked to new developments. The legislation, S731, replaces an earlier...

Read more
Read Local Officials Reject Proposed Data Center in New Brunswick, New Jersey
Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

February 21, 2026 New Jersey

Local authorities in New Brunswick, New Jersey, voted on Wednesday against allowing the construction of a data center on a plot of land slated for redevelopment, instead requiring that a park be built on the site. The New Brunswick City Council was reviewing a proposal for the Jersey-Sandford...

Read more
Read New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers
New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

January 13, 2026 New Jersey

The New Jersey Senate has advanced a bill that would create new tariff classes for “large load” data centers in an effort to protect ratepayers in the state from cost increases.The bill, cosponsored by ten Democrat lawmakers, would require public electrical utilities in the state to submit...

Read more
Read Stack Overflow Fully Exits Data Centers
Stack Overflow Fully Exits Data Centers

Stack Overflow Fully Exits Data Centers

January 06, 2026 New Jersey

Stack Overflow, a question-and-answer website for computer programmers, has officially exited its data center in New Jersey as part of its cloud migration effort. Stack noted that for the past 16 years it had been operating out of a physical data center in which the site reliability engineer...

Read more
Read NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey
NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey

NJFX Plans 10MW Liquid-cooled Data Hall in New Jersey

December 01, 2025 New Jersey

NJFX is expanding its cable landing station and data center site in New Jersey. The firm said the move is supported by the execution of an electric utility load letter supported by a $3 million deposit, targeting power delivery by end of 2026. Bala Consulting Engineers is working with the company...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?