Local Officials Reject Proposed Data Center in New Brunswick, New Jersey
February 21, 2026
New Jersey
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry. In 2019, ESite Systems acquired data centers in Maryland and Pennsylvania that were previously owned and operated under the Agile brand.
AGILE Princeton is conveniently located, 45 minutes via car or train from both New York & Philadelphia and just 5 miles from the Princeton Junction train station.
AGILE Princeton is fed from the 13.2kV PSE&G utility. This line is capable of supporting up to 5MW of power. The utility line is double-ended. One substation is located about 1 mile from the site, with a second substation 2 miles away.
The data center power distribution features N+N redundant component and distribution including dual generators and dual uninterruptible power supply (UPS.) The HVAC system is made up of N+1 redundant air-cooled CRAC units, 50 percent of which will have dual power sources.
All critical systems are monitored by Tridium Niagara monitoring systems.
| Distance | Site | About |
|---|---|---|
| 1.04 miles | Princeton Nurseries Data Center |
The owner of the Princeton Nurseries site in New Jersey is seeking to develop a 340,985 sq ft (31,678 sqm) data center. This data center is part of a larger redevelopment plan for the 160-acre plot.
|
| 1.33 miles | Lumen South Brunswick 1 | |
| 6.49 miles | QTS: East Windsor 1 |
QTS is expanding its data center campus in Princeton, New Jersey. The first phase of the project was topped off in November, 2024.
|
| 11.91 miles | BNY Mellon Somerset | |
| 12.09 miles | CyrusOne Somerset |
Phase 1 is 50,000 gross sqft at full build out the facility will have 330,00 gross sqft. The total building's sqft is 430,000sqft and sits on 22.5 acres
|
| 12.25 miles | Morgan Stanley Somerset |
|
| 12.35 miles | Rackspace: Somerset NYC2 |
|
| 12.35 miles | Rackspace Belmont NYC2 | |
| 12.59 miles | Rackspace Somerset NYC1 |
1.2 MW UPS Power Capacity
N+N Redundancy
|
| 13.20 miles | Chirisa: Piscataway |
Chirisa Technology Parks (CTP) is growing its New Jersey data center footprint. The company has purchased a substantial property in Piscataway, with plans to develop a major data center facility starting in 2024.
|
| 13.24 miles | Digital Fortress Piscataway |
|
| 14.18 miles | QTS: Piscataway 2 |
QTS planned for the expansion in 2022 with Additional 2 story, 50,000 sq. ft of space.
|
| 14.25 miles | QTS Piscataway |
The site was acquired from Dupont Fabros in June 2016 for $125 million. It was previously known as "DuPont Fabros NJ1" when owned by Dupont.
|
| 14.32 miles | DataBank Piscataway EWR2 |
|
| 14.41 miles | Open Data Centers Piscataway | |
| 14.47 miles | 365 S Randolphville - Digital Realty | |
| 14.47 miles | Centersquare: Piscataway EWR3-B |
The Piscataway facility was formerly known as NJ4.
|
| 14.59 miles | 1115 Centennial Ave: Digital Realty | |
| 14.62 miles | Verizon Wireless Branchburg | |
| 14.68 miles | Centersquare: Piscataway EWR3-A |
|
| 14.68 miles | 3 Corporate - Digital Realty |
3 Corporate Place contains approximately 135,000 square feet of state-of-the-art data center space and 25,000 square feet of office space. It offers 26 MW of utility power capacity.
|
| 14.92 miles | 365 Bridgewater NJ |
The New Jersey facility is located in Bridgewater, NJ, just 40 miles west of New York City along the fiber-rich “Magic Mile.” The 25,565-square-foot data center offers 2.3MW of capacity.
|
| 16.46 miles | LexusNexis Edison NJ |
|
| 16.47 miles | Iron Mountain New Jersey |
Iron Mountain's site is in Edison, NJ. Iron Mountian acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 IO sites
|
| 16.91 miles | Northpoint: Keystone Trade Campus |
NorthPoint Development has received approval to build a 2 million-square-foot data center campus within its Keystone Trade Center in Bucks County.
|
| 16.91 miles | Hyperscale Data Center Request Dataset |
The planned facility, spanning 1 million square feet (92,905 square meters), will be operated as a data center by a tenant rather than by the property's owner, NorthPoint Development.
|
| 19.19 miles | Keystone NAP |
Keystone’s facility is a repurposed former steel mill, which was converted into a data center building, was once the largest vertically integrated steel production site in the U.S.
|
February 21, 2026
New Jersey
January 13, 2026
New Jersey
January 06, 2026
New Jersey
December 01, 2025
New Jersey
November 29, 2025
New Jersey
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas