United Integrity: Princeton

Latest Podcast 700 College Road East
OperationalProspective Expansion
Fully operational facility with prospective expansion planned
Operated by:

United Integrity: Princeton

Year Built: 2009
Utility Provider: PSE&G
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

Building

A purpose-built data center at 700 College Road East in the Princeton Forrestal Center, Plainsboro Township (Princeton mailing address), roughly 178,000 sq ft on a 17.7-acre lot, constructed in 1989 for a major financial institution. United Integrity Advisors markets the facility as United Integrity Data Centers - Princeton, with design flexibility for increased densities in N+1 configurations. Multiple cabinet density configurations are available from 8 kW to 100 kW per rack, in custom air-cooled or liquid-cooled deployments. The lot has capacity for future physical expansion.

Power infrastructure

The site is served underground by two independent 13.2 kV lines from separate substations, Plainsboro and Penns Neck, with one line contracted today and significant 69 kV capacity available for future growth. On-site emergency generation backs the entire facility at N+1, and two modular UPS plants (installed 2008 and 2009) with static transfer switches on each side are immediately available. A 4-inch behind-the-meter natural gas line gives the site fuel-cell capability.

Cooling

Chilled-water evaporative cooling powered by four 900-ton York chillers and three 900-ton Marley cooling towers. The water-cooled plant runs an economizer mode through plate-and-frame heat exchangers at wet-bulb temperatures under 39.5 F. The chilled-water plant includes redundant chiller loops and redundant pumps.

Connectivity

Significant existing lit-carrier ecosystem with diverse paths and multiple points of entry, with proximity to local data lakes. Lit carriers include Crown Castle, ExteNet, Lumen, Zayo, Comcast, Lightpath, and Verizon, among others.

Map and Nearby Locations

700 College Road East
United Integrity Advisors Sites
Nearby Facilities

United Integrity: Princeton Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of United Integrity: Princeton

Distance Site About
1.40 miles Princeton Nurseries Data Center
The owner of the Princeton Nurseries site in New Jersey is seeking to develop a 340,985 sq ft (31,678 sqm) data center. This data center is part of a larger redevelopment plan for the 160-acre plot.
1.68 miles DataBridge: Princeton NJ
AGILE Princeton is conveniently located, 45 minutes via car or train from both New York & Philadelphia and just 5 miles from the Princeton Junction train station.
2.74 miles Lumen South Brunswick 1
5.07 miles QTS: East Windsor 1 DC2
The proposed expansion in East Windsor involves a $600 million investment by QTS Data Centers to build a second, state-of-the-art facility on its existing Princeton-Hightstown Road campus.
5.20 miles QTS: East Windsor 1 DC1
QTS is expanding its data center campus in Princeton, New Jersey. The first phase of the project was topped off in November, 2024.
13.58 miles BNY Mellon Somerset
13.76 miles CyrusOne Somerset
Phase 1 is 50,000 gross sqft at full build out the facility will have 330,00 gross sqft. The total building's sqft is 430,000sqft and sits on 22.5 acres
13.93 miles Morgan Stanley Somerset
14.03 miles Rackspace: Somerset NYC2
14.03 miles Rackspace Belmont NYC2
14.27 miles Rackspace Somerset NYC1
1.2 MW UPS Power Capacity N+N Redundancy
14.88 miles Chirisa: Piscataway
Chirisa Technology Parks (CTP) is growing its New Jersey data center footprint. The company has purchased a substantial property in Piscataway, with plans to develop a major data center facility starting in 2024.
14.92 miles Digital Fortress Piscataway
15.29 miles Northpoint: Keystone Trade Campus
NorthPoint Development has received approval to build a 2 million-square-foot data center campus within its Keystone Trade Center in Bucks County.
15.29 miles ProInterested in this information?Contact us
The planned facility, spanning 1 million square feet (92,905 square meters), will be operated as a data center by a tenant rather than by the property's owner, NorthPoint Development.
15.85 miles QTS: Piscataway 2
QTS planned for the expansion in 2022 with Additional 2 story, 50,000 sq. ft of space.
15.91 miles Verizon Wireless Branchburg
15.92 miles QTS Piscataway
The site was acquired from Dupont Fabros in June 2016 for $125 million. It was previously known as "DuPont Fabros NJ1" when owned by Dupont.
15.97 miles DataBank Piscataway EWR2
16.06 miles Open Data Centers Piscataway
16.13 miles Centersquare: Piscataway EWR3-B
The Piscataway facility was formerly known as NJ4.
16.13 miles 365 S Randolphville - Digital Realty
16.24 miles 1115 Centennial Ave: Digital Realty
16.33 miles 3 Corporate - Digital Realty
3 Corporate Place contains approximately 135,000 square feet of state-of-the-art data center space and 25,000 square feet of office space. It offers 26 MW of utility power capacity.
16.33 miles Centersquare: Piscataway EWR3-A
16.56 miles 365 Bridgewater NJ
The New Jersey facility is located in Bridgewater, NJ, just 40 miles west of New York City along the fiber-rich “Magic Mile.” The 25,565-square-foot data center offers 2.3MW of capacity.
17.79 miles Keystone NAP
Keystone’s facility is a repurposed former steel mill, which was converted into a data center building, was once the largest vertically integrated steel production site in the U.S.
17.90 miles LexusNexis Edison NJ
17.90 miles Iron Mountain New Jersey
Iron Mountain's site is in Edison, NJ. Iron Mountian acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 IO sites

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Data Centre Developer Sues New Jersey Town for $300m
Data centre developer Hexa Builders is seeking $300 million in damages from Monroe Township, New Jersey, after officials rejected its proposed 1 million sq ft data centre in May. The lawsuit, filed...

Data Centre Developer Sues New Jersey Town for $300m

July 30, 2026 New Jersey

Data centre developer Hexa Builders is seeking $300 million in damages from Monroe Township, New Jersey, after officials rejected its proposed 1 million sq ft data centre in May. The lawsuit, filed in New Jersey Superior Court, alleges the township council and planning board violated multiple...

Read more
Read New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff
New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other rate...

New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff

July 03, 2026 New Jersey

New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other ratepayers from rising costs linked to new developments. The legislation, S731, replaces an earlier...

Read more
Read Local Officials Reject Proposed Data Center in New Brunswick, New Jersey
Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

February 21, 2026 New Jersey

Local authorities in New Brunswick, New Jersey, voted on Wednesday against allowing the construction of a data center on a plot of land slated for redevelopment, instead requiring that a park be built on the site. The New Brunswick City Council was reviewing a proposal for the Jersey-Sandford...

Read more
Read New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers
New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

January 13, 2026 New Jersey

The New Jersey Senate has advanced a bill that would create new tariff classes for “large load” data centers in an effort to protect ratepayers in the state from cost increases.The bill, cosponsored by ten Democrat lawmakers, would require public electrical utilities in the state to submit...

Read more
Read Stack Overflow Fully Exits Data Centers
Stack Overflow Fully Exits Data Centers

Stack Overflow Fully Exits Data Centers

January 06, 2026 New Jersey

Stack Overflow, a question-and-answer website for computer programmers, has officially exited its data center in New Jersey as part of its cloud migration effort. Stack noted that for the past 16 years it had been operating out of a physical data center in which the site reliability engineer...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?