Site: Prime Sacramento

Company: Prime Data Centers
Metro: Sacramento
State: California
Country: United States
Region: North America
Region: Americas
Address:
Utility Provider: SMUD
Gross SqFt: 66,000
Usable SqFt: 40,000
Total Power: 6.0 Megawatts
Ownership: Prime Data Centers owns the building.

The Prime data center campus is located on 38 acres in the McClellan Park. Prime received $1.2 million in tax credits from a committee of the Governor’s Office of Business and Economic Development.

Power

  • Provider: SMUD; natural gas “peaker” <1 mi.
  • Feeds: (2) 69kV; fed from Elverta & Hurley
  • Substation: Dedicated and On-site
  • Utility: 45MW currently, 90+MW capacity
  • UPS Capacity: 6MW
  • UPS Type: VRLA Battery
  • UPS Redundancy: N+1
  • Backup Power Generation: 9MW
  • Generator Redundancy: N+1
  • Fuel Storage: 24 hours; 5,000 gallon belly tank
  • Diesel Re-fuel Station Proximity: <1 mile
  • A+B Feeds on UPS: Yes
  • Power Meter Location: @PDU
  • Cabinet Densities: up to 24kW
  • PDU Redundancy: N+1
  • Design P.U.E.: ~1.2

Map and Nearby Locations:

2407 AK Street, McClellan Park, CA 95652

SITES within 15 miles of Prime Sacramento

Show SqM



Distance Site name SqFt MW
1.64 miles Consolidated McClellan
4.30 miles QTS Sacramento 92,000 9.00
4.48 miles RagingWire Sacramento Campus CA1, CA2, CA3 650,000 50.90
4.48 miles RagingWire CA1
4.48 miles ANEXIO CA1
4.62 miles RagingWire CA2
4.96 miles RagingWire CA3
5.65 miles Level3 Sacramento (1005 North B)
6.25 miles Level3 (was GX) Sacramento 4,700
6.52 miles Integra Sacramento 320
Phase I is 15 MWs
Phase 2 will be 30 MWs
Phase 3 will be up to 45 MWs

Site Overview for Building One on Prime's Campus
Source: Prime Data Centers
Phase I is 15 MWs
Phase 2 will be 30 MWs
Phase 3 will be up to 45 MWs
The Prime Campus Will be Built in Three Phases

Phase I is 15 MWs
Phase 2 will be 30 MWs
Phase 3 will be up to 45 MWs

Source: Prime Data Centers