PACE: Lone Star Project

Latest Podcast
Glasscock County
Land BankPlanned
Future facility in planning with land secured
Operated by:

PACE: Lone Star Project

Year Planned: 2028

Pace is developing the Lone Star Project in Glasscock County, focusing on a "speed to power" strategy to support intensive AI workloads. The campus utilizes behind-the-meter natural gas to generate electricity on-site, allowing the project to begin operations independently of the primary power grid.

This self-sufficient energy model is supported by secured land, water rights for cooling, and redundant fiber connectivity. While the site is designed for massive long-term scalability, the developer intends to eventually integrate with ERCOT to supplement its on-site generation and further expand its infrastructure footprint within the Texas market.

Map and Nearby Locations:

Glasscock County
PACE AI Infrastructure Sites
Nearby Facilities

Sites within 15 miles of PACE: Lone Star Project

Distance Site About
0.00 miles Crypto Mining Data Center Request Dataset
0.47 miles Crypto Mining Data Center Request Dataset
8.50 miles Marathon Digital: Garden City TX
The Bitcoin mining data center in Garden City, Texas is located adjacent to a wind farm and uses predominantly renewable energy. It was constructed and energized in 2023 and supports a workforce of approximately 25 employees.

PACE: Lone Star Project Data Center Photos (See all)

Operating Company

Operated by:

Pace is a data center firm based in Austin, Texas, and founded by Preston Stein and Chance Pressley. PACE is focused on AI and high-performance compute projects where site control, power strategy, commercial structuring, and execution discipline all matter from day one.

1
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?