Carrier-Neutral Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Woodbury, MN 55125, USA
Operational
Fully operational facility
Operated by: Carrier-Neutral OperatorInterested in this information?Contact us

Carrier-Neutral Data Center

Short Code: CodeInterested in this information?Contact us
Year Built: 2024
Utility Provider: Excel Energy
Lot Size: 19 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
  • Availability: 99.999% uptime (≤5.26 minutes downtime annually).
  • Cooling: Redundant chilled water loop and liquid cooling systems.
  • Connectivity: On-net with Zayo, Lumen, and Cogent via three diverse POEs
  • 85,334 sq/ft building
  • 19.4 acres
  • 15-18 foot earthen berms surrounding the property
  • Adjacent to the largest fiber bandwidth pipes feeding the Twin Cities
  • 208 MPH wind rated structure
  • SOC II compliant
  • Low energy costs ($.075-.0795 kWh + PUE)

Map and Nearby Locations

This Facility
Carrier-Neutral OperatorInterested in this information?Contact us Sites
Nearby Facilities

Carrier-Neutral Data CenterInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Carrier-Neutral Data CenterInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
NN milesInterested in this information?Contact us US Signal: Saint Paul
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
NN milesInterested in this information?Contact us QLevr: Inver Grove Heights
In Inver Grove Heights, Minnesota, Florida-based developer QLevr has proposed a $150+ million edge data center at the former Travel Tags industrial site.
NN milesInterested in this information?Contact us H5 Minneapolis
NN milesInterested in this information?Contact us Connect Data Centers: Eagan, MN
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
NN milesInterested in this information?Contact us Centra: Minneapolis
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
NN milesInterested in this information?Contact us DataBank Minneapolis Eagan MSP2
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us

Operating Company

Operated by: Carrier-Neutral OperatorInterested in this information?Contact us
This operator's profile is available on request. Full company details, market presence, portfolio scale, and operating history are available to subscribers with unblurred access. Contact us to unlock the complete operator profile for this facility and every other location in their footprint.Interested in this information?Contact us
120Interested in this information?Contact us
Facilities
24Interested in this information?Contact us
Markets
480MWInterested in this information?Contact us
Megawatts

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents

Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024

Ready to Level up Your
Data Center Strategy?