NTT: Hanoi Thang Long

Latest Podcast 17 Phố Ngô Thì Sỹ
Operational
Fully operational facility
Operated by:

NTT: Hanoi Thang Long

Year Built: 2009
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The NTT Communications Hanoi Thang Long Data Center is a data center operated by NTT Communications (Japan) and Global Data Service (GDS) in Hanoi, Vietnam. The data center offers a 6000 m2 colocation space and features redundant power, cooling, and network facilities.

• Loop path
• UPS in N+1 configuration
• Diesel generator in N+1 configuration
• Dual power feed to each rack
• Power supply: up to 4kVA/rack
• ISO 27001 Certified

Map and Nearby Locations

17 Phố Ngô Thì Sỹ ( làng Vạn Phúc, Vạn Phúc, Hà Đông )
NTT Sites
Nearby Facilities

NTT: Hanoi Thang Long Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT: Hanoi Thang Long

Distance Site About
3.47 miles FPT FORNIX HN02 (Hanoi)
3.48 miles EC52 Hanoi
3.66 miles FPT IDC
3.66 miles CMC Telecom: Hanoi HN01
CMC Telecom operates a Tier 3 certified Data Center in Hanoi with a total area of 1,200 m² and a power area accommodating over 220 racks.
3.69 miles Telehouse Vietnam Hanoi
4.14 miles Viettel: An Khanh Campus
The An Khanh Data Centre, located on a 1.9-hectare site in Hanoi, is a key national project valued at 17.5 trillion VND (approximately $665 million).
4.36 miles VNPT IDC: Tai Toa Nha Internet
VNPT IDC at the Nha Internet Building offers nearly 1,700 m2 of space and over 160Gbps of connected bandwidth, with scalability for future growth.
4.43 miles VNPT IDC: Cau Giay
VNPT IDC operates a data center in Cau Giay spanning 5,500 sqm of data center space and offering a capacity of 399 racks.
4.88 miles Viettel IDC: Phap Van
The Phap Van Data Center is designed and built according to Tier 3 international standards, consisting of 9 floors with 3000m² of server room floor space.
5.52 miles VNIX-HN
The VNIX-HN data center is operated by the Vietnam Internet Network Information Center (VNNIC) and is located in Hanoi, Vietnam.
7.19 miles VNPT IDC: Nam Thang Long
This is an internationally standardized IDC, with a construction area of nearly 10,000m², which opened at the end of 2015.
8.80 miles Hanel-CSF CX4
CSF Group holds a 20 percent investment in CX4, a data center in Hanoi, Vietnam, encompassing approximately 3,300 square feet of net data center space.
9.14 miles VNPT IDC GDS
The VNPT IDC GDS data center is located in Thang Long Industrial Park in Hanoi, Vietnam.
14.05 miles SAM DigitalHub
Saigon Asset Management (SAM) plans to develop the SAM DigitalHub, a 124-acre data center campus outside Ho Chi Minh City, Vietnam.
15.25 miles Viettel IDC: Hoa Lac 2
Spanning 21,000 sqm and housing more than 2,400 racks, this facility stands out as the first in the country to commit to sourcing 30 percent of its energy from renewable sources.
15.86 miles MobiFone: Hanoi
Mobifone Corporation has a data center located in the Hoa Lac High-tech Park in Hanoi, Vietnam.
15.87 miles VNPT IDC: Hoa Lac
The VNPT IDC Hoa Lac, recognized as Vietnam's largest data center, has a capacity of up to 2,000 racks.
16.00 miles Viettel IDC: Hoa Lac
The Viettel IDC Hoa Lac Data Center has 21,000 square meters of floor space, meeting Tier 3 international standards.

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia
[NTT DATA](https://www.nttdata.com/en-us/news/2026/ntt-data-opens-jakarta-data-center) opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakar...

NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia

November 03, 2026 NTT

NTT DATA opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakarta. The facility, the Jakarta 2 Annex Data Center, is known as JKT2A and sits inside NTT DATA's Jakarta campus. JKT2A extends the JKT2 campus, which hosts more than 240 network...

Read more
Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?