PUE: 1.5
Lot Size: 4 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Tulip Data Centre Services, a subsidiary of Tulip Telecom, opened Tulip Data City in Whitefield in February 2012. Tulip built it to Tier III and Tier IV design standards, with room for up to 12,000 racks. The Delhi High Court later ordered Tulip Telecom wound up, and the company is in liquidation.

The building has seven levels. The two base floors hold utilities and offices. A 66 kV substation stands at the front of the building, and two 11 kV feeds supply the data center on separate paths. The ground floor also holds the fuel tank, 24 diesel generator sets and the electrical panels. The first floor held Tulip's offices, meet-me rooms for carriers, and the network and security operations centers.

Four towers of five floors each rise above the second level and hold the data halls. Each floor plate has three server halls with about 13,000 sq ft of raised floor and room for about 550 racks, served by N+N UPS with static transfer switches. Chillers on each tower roof cool the floors, and the design added airside economizers. The halls were designed for an average of 9 kW per rack and a floor load of 1,250 kg per square meter. The building meets Seismic Zone 4 specifications.

Site History

  • In July 2019, the Delhi High Court issued its final order to wind up Tulip Telecom and appointed the Official Liquidator.
  • In May 2013, creditors petitioned the Delhi High Court to wind up Tulip Telecom.
  • In February 2012, Sachin Pilot, Minister of State for Communications and IT, inaugurated Tulip Data City.
  • In January 2011, Tulip Data Centre Services bought the facility by acquiring Sada IT Parks for Rs 230 crore.

Map and Nearby Locations

#162(P), 163, 164(P), 165(P) EPIP Area ( Phase II, Whitefield )
Tulip Data Center Services Pvt Ltd Sites
Nearby Facilities

Sites within 15 miles of Tulip Data City TDC Bangalore

Distance Site
0.62 miles Nxtra: Bengaluru I
0.78 miles STT Bangalore 3
0.92 miles STT Bangalore 2
0.99 miles Sify: Bangalore 02
1.47 miles Iron Mountain: Bengaluru
1.56 miles CapitaLand: Bangalore 01
1.81 miles Reliance Bengaluru IDC3
2.29 miles L&T: Bengaluru BLR1
5.06 miles Nxtgen Infinite Bengaluru Whitefield
5.07 miles NxtGen Infinite Bengaluru
5.28 miles NTT Bengaluru DC3
6.15 miles Nxtra: Bengaluru II
8.07 miles CtrlS Bengaluru
8.42 miles AdaniConneX: Bengaluru
9.79 miles NTT Bengaluru (DC2)
9.82 miles Sify: Bangalore 01
9.83 miles ESDS: Bengaluru DC
10.12 miles STT Bangalore 1
12.80 miles Teleindia Datasamudra
13.19 miles Reliance Bengaluru IDC2
13.27 miles Reliance Bengaluru
16.10 miles NTT: BLR 4C
16.12 miles NTT: BLR 4B
16.14 miles NTT: Bengaluru 4 Campus

Operating Company

Operated by:

Tulip Data Center Services Pvt Ltd is a wholly owned subsidiary of Tulip Telecom Ltd, an Indian provider of enterprise data connectivity, managed services and data center services. Tulip Telecom defaulted on foreign currency convertible bonds due in 2012, the Delhi High Court appointed a provisional liquidator, and the parent company is now under liquidation. The subsidiary was incorporated in Karnataka in October 2010 and is registered at Tulip Data City in the EPIP Area of Whitefield, Bengaluru.

Tulip Data City covers 0.9 million square feet, has space for up to 12,000 racks and was built to Tier 3 and Tier 4 standards.

Tulip Data Center Services Pvt Ltd History:

  • In February 2012, Minister of State for Communications and IT Sachin Pilot inaugurated Tulip Data City.
  • In January 2011, the company bought SADA IT Parks, the owner of the Bengaluru data center building.
  • Founded in 2010 in Bengaluru.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Web Werks-Iron Mountain JV announces launch of its first Bengaluru data center
Web Werks-Iron Mountain JV announces launch of its first Bengaluru data center

Web Werks-Iron Mountain JV announces launch of its first Bengaluru data center

March 26, 2023 Bengaluru (Bangalore)

Web Werks - Iron Mountain Data Centers (IMDC) Joint Venture has announced that it has launched its first data center on its campus in Bengaluru, India. Based in Whitefield, Bengaluru, the facility spans 80,000 square feet and is named the BLR-1. It is a Tier III-designed data center that can...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.