Naver: Gak Chuncheon

Latest Podcast
1231 Sunhwan-daero
Operational
Fully operational facility
Operated by:

Naver: Gak Chuncheon

Year Built: 2013
PUE: 1.09
░░░░ Request Dataset MW
Total Power

Naver's Chuncheon data center, which opened in 2013, is connected to a local hydroelectric power stations. The facility features 51U racks, each equipped with 44 servers and operating at 11kW rack densities. The company reports a Power Usage Effectiveness (PUE) of 1.09. GAK Chuncheon is NAVER's first eco-friendly data center that minimizes impact on nature while maximizing the efficiency.

Map and Nearby Locations:

1231 Sunhwan-daero
Naver Corp. Sites
Nearby Facilities

Sites within 15 miles of Naver: Gak Chuncheon

Distance Site About
4.92 miles Samsung SDS: Chuncheon
Located in Chuncheon, South Korea, the Samsung SDS Chuncheon Data Center is a cutting-edge facility opened in September 2019, spanning 39,780 sqm with a gross floor area of 18,542 sqm.

Naver: Gak Chuncheon Data Center Photos (See all)

Operating Company

Operated by:

NAVER Corp. is a global ICT company, providing South Korea’s number one search portal "NAVER" and its subsidiaries and affiliates provide services, including LINE messenger, SNOW camera app, digital comics platform NAVER WEBTOON, group social media platform, NAVER BAND, and metaverse platform ZEPETO.
The sustained research and development of AI, robotics, mobility, and other future technology trends are propelling NAVER forward, in pursuit of the transformation and innovation of technology platforms, while it also remains devoted to a paradigm of shared growth, joining hands with users from the global community as well as a vast number of partnerships.
In 2018, NAVER was ranked as the 9th most innovative company by Forbes and top 6th Future 50 company by Fortune magazine.

4
Facilities
0
Markets
135MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?