Rosatom acquires a data center in development; the 36MW facility is set to open in 2024
August 14, 2023
Moscow / Москва́
| Distance | Site | About |
|---|---|---|
| 16.16 miles | NORD-6 | |
| 16.21 miles | NORD-3 | |
| 16.23 miles | NORD-4 | |
| 16.24 miles | Rostelecom NORD Campus |
|
| 16.27 miles | NORD-1 | |
| 16.28 miles | NORD-2 | |
| 16.29 miles | NORD-5 | |
| 17.99 miles | IXcellerate: MOS12 |
This facility is part of IXcellerate's Vёshki Campus in Moscow.
|
| 18.00 miles | IXcellerate: Vёshki Campus (MOS11) |
The new IXcellerate Vёshki site is designed to deliver a massive total capacity of 7,500 rack spaces across two specialized facilities, MOS11 and MOS12.
|
| 18.80 miles | Rackspace Moscow MOW80 |
|
| 19.19 miles | IXcellerate: MOS4 |
The Moscow Four (MOS4) data center, situated within the Moscow North campus, features a total capacity of 512 racks.
|
| 19.22 miles | IXcellerate: Moscow North Campus (MOS1) |
The IXcellerate Moscow North campus in Altufyevo is the company’s foundation site, established in 2011.
|
| 19.23 miles | IXcellerate: MOS3 |
This 2,400-rack facility is the fourth and final building at the firm’s Moscow North Campus in the Altufyevo district. The four-story structure spans 7,365 sqm (79,276 sq ft) across six dedicated data halls.
|
| 19.30 miles | IXcellerate: MOS2 |
Moscow Two (MOS2) is a Tier III facility that accommodates 1580 racks across 3300 m² of space.
|
| 19.32 miles | Selectel: Berzarina |
Berzarina data center spans 7,000 m², with a dedicated server room area of 2,777 m² designed to hold 1,420 racks.
|
August 14, 2023
Moscow / Москва́
January 27, 2023
Moscow / Москва́
July 13, 2022
Moscow / Москва́
May 20, 2022
Moscow / Москва́
May 19, 2022
MTS Group
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas