Midas Compute: Big Spring

Latest Podcast 1202 N FM 700
Land BankPlannedProspective Expansion
Future facility in planning stagefacility with additional land secured and prospective expansion planned
Operated by:

Midas Compute: Big Spring

Year Planned: 2028
Lot Size: 10 acres

Midas Compute is developing an AI data center on a 10-acre site on North FM 700 in Big Spring, West Texas. The site will run on its own natural-gas generation.

Site History

  • In September 2026, Midas filed for an air authorization for the on-site generation.
  • In late 2025, site grading began.

Project Profile

  • Midas plans the campus in three stages, built from modular GPU blocks.

Map and Nearby Locations

1202 N FM 700
Midas Compute Sites
Nearby Facilities

Midas Compute: Big Spring Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Midas Compute: Big Spring

Distance Site About
2.47 miles Onmine: Big Springs Project
The Big Spring Project is a high-density data center currently under construction by infrastructure developer ONMINE in Big Spring, Texas.
5.35 miles Tower PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.82 miles Satoshi Energy: Elbow Creek
Crypto-mining company Satoshi Energy has activated a new data center at a Texas wind farm, marking the first phase of a collaboration with energy firm Clearway.
13.07 miles QTS: Howard County
QTS Data Centers is planning a data center campus on about 900 acres west of Big Spring in Howard County, Texas. The plan calls for eight buildings.

Operating Company

Operated by:

Midas Compute is a founder-led startup that develops AI data center capacity on a site it controls in Howard County, Texas, next to transmission infrastructure. Co-founders Dragan Jovanovic (CEO), Stefan Paris Michaelides (CFO) and Nick Rose Ntertsas (CSO) previously built natural-gas-powered bitcoin mining operations through Terra Solis. The company plans a phased campus with on-site natural gas generation and offers tenants a repeatable liquid-cooled module of 32 NVIDIA GB300 NVL72 racks. Its listed investors include Alpha Protocol Ventures and Neriah Investments.

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.