Published in Malaysia

GSD raises $270m green financing for Malaysian facility

Dec 08, 2023 | Posted by Abdul-Rahman Oladimeji

Chinese data center developer and operator GDS has raised MYR1.27 billion ($270m) in green financing for its Nusajaya Tech Park data center in Malaysia. The finance was secured from four financial institutions: UOB Malaysia, Bank of China (Malaysia) Berhad, OCBC Bank (Malaysia) Berhad, and Standard Chartered Bank (Malaysia) Berhad.

William Huang, chairman and CEO of GDS said, "We are excited to announce our collaborations with these highly prestigious and forward-thinking banks. With their support, these green loans will fuel our business with green energy, empowering us to extend our reach and embark on a sustainable journey in Southeast Asia.”

Ng Wei Wei, CEO of UOB Malaysia said: "UOB has been supporting GDS in its regional ambitions through our strong connectivity and we are honored to be given the mandate as sole coordinator and joint MLAB for their maiden venture in Malaysia. Our financing for GDS's state-of-the-art green data center underscores our commitment to support the nation's net-zero ambitions and aspiration to be a leading regional data center hub."



There are 177 data centers in Malaysia.

Rendering of Empyrion Digital's Nusajaya MY1 Campus in Johor
Posted in Empyrion: Nusajaya Campus MY1 Source: Empyrion Digital
Rendering of Stack Infrastructure's JHB01 Campus in Johor
Posted in Stack: Johor JHB01 Source: STACK Infrastructure
Yondr's Johor Data Center in Malaysia
Posted in Yondr: Johor Source: Yondr
Rendering of BrightRay's Sedenak Tech Park Campus in Johor
Posted in BrightRay: Johor MY-01 Source: BrightRay
BrightRay's Sedenak Tech Park Campus under construction in Johor
Posted in BrightRay: MY-02 Source: BrightRay
Rendering of AirTrunk's JHB2 Data Center in Johor
Posted in AirTrunk: Johor JHB2 Source: AirTrunk
Rendering of GDS Kempas Tech Park in Kempas Lama, Johor
Posted in DayOne: Kempas Tech Park Source: Aplus
Rendering of AirTrunk JHB1 Data Center in Johor, Malaysia
Posted in AirTrunk Johor Bahru JHB1 Source: AirTrunk
Johor Menteri Besar Datuk Onn Hafiz Ghazi (third from left) and YTL Power international Bhd's managing director Datuk Yeoh Seok Hong (fourth from left) looking at the scale model of the RM15 billion YTL Green Data Centre Park
Posted in YTL Johor Source: YTL Power
Rendering
Posted in YTL Johor |
Front Gate
Posted in Bridge Kidex Sedenak MY06-01 |
Exterior gate
Posted in Keppel DC: Johor Sedenak 1 |
Basis Bay Data Centre built in 2009
Posted in Keppel Cyberjaya Basis Bay DC |
Aerial rendering
Posted in Bridge Kidex Sedenak MY06-01 |
CJ1 data centre
Posted in Vantage Cyberjaya KUL11 |
CBJ5 when completed in 2021
Posted in NTT Cyberjaya CBJ5 |
TM's VADS CyberJaya facility
Posted in Cyberjaya Klang Valley (KVDC) |
Rendering of the Klang Valley Core DC
Posted in Cyberjaya Klang Valley (KVDC) |
Aerial photo of the Iskandar Puteri facility
Posted in Iskandar Puteri Core Data Centre (IPDC) |
Glass Facade of the VADS Johr data center
Posted in Iskandar Puteri Core Data Centre (IPDC) |
Grand opening of the KVDC in 2019
Posted in Cyberjaya Klang Valley (KVDC) |
Meeting room is available next to the staging area.
Customer Meeting Room
Posted in NTT Cyberjaya 4 Source: NTT

Designated staging area is available for customer use.
Staging Area
Posted in NTT Cyberjaya 4 Source: NTT
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.
Generator Room
Posted in NTT Cyberjaya 4 Source: NTT
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Standard Cabinets
Posted in NTT Cyberjaya 4 Source: NTT
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
Power Cable
Posted in NTT Cyberjaya 4 Source: NTT
Location Total SqFt Gross SqFt Power (MW)
Open DC: PE2 110,000 SqFt
NN
AIMS Suntech @ Penang Cybercity 10,764 SqFt
VADS Ipoh 1,972 SqFt
NN
Open DC: Penang PE1 1,000 SqFt
NN
Kuala Terengganu Service Centre

Ready to Level up Your
Data Center Strategy?