Lumen Worchester I

Latest Podcast
474 Main Street
Operational
Fully operational facility
Operated by:

Lumen Worchester I

░░░ Request Dataset MW
Total Power

Map and Nearby Locations:

474 Main Street
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen Worchester I

Distance Site About
0.00 miles Crown Castle Worcester
10.01 miles Iron Mountain Boston
BOS-1 security includes background-checked Iron Mountain officers on-site 24x7x365, three-factor access controls, mantraps, and numerous other features.
11.64 miles Mass General Brigham
11.86 miles Colocation America - Boston
11.87 miles TierPoint Marlborough
Single story with concrete masonry walls Raised floor design supports 150+ watts/sq ft Office Space Certifications: SSAE 16 SOC1 & SOC2, Type II
11.95 miles Menlo: 34 St Martin
12.00 miles Crown Castle Marlborough
12.80 miles 365 Marlborough, MA

Lumen Worchester I Data Center Photos (See all)

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
79
Markets
277MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?