Lumen Santa Teresa

Latest Podcast 175 Harrier Drive
Operational
Fully operational facility
Operated by:

Lumen Santa Teresa

░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

Map and Nearby Locations

175 Harrier Drive
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen Santa Teresa

Distance Site About
4.08 miles Point PlusInterested in this information?Contact us
Building 3 of Phase 1 at OpenAI/Oracle's Project Jupiter Stargate campus, under construction in Santa Teresa, Doña Ana County, New Mexico.
4.68 miles Plaza BetaInterested in this information?Contact us
Building 4 of Phase 1 at OpenAI/Oracle's Project Jupiter Stargate campus, under construction in Santa Teresa, Doña Ana County, New Mexico.
4.76 miles Cloud HubInterested in this information?Contact us
Project Jupiter is a 1,400-acre OpenAI/Oracle Stargate hyperscale data center campus under construction in Santa Teresa, Doña Ana County, New Mexico, near El Paso. Developed by BorderPlex Digital Assets and STACK Infrastructure, leased by Oracle (OCI) with OpenAI as primary client, and powered by on-site natural gas generation.
5.12 miles Plaza GammaInterested in this information?Contact us
Building 2 of Phase 1 at OpenAI/Oracle's Project Jupiter Stargate campus, under construction in Santa Teresa, Doña Ana County, New Mexico.
5.73 miles Tower ProInterested in this information?Contact us
Expansion phase of the OpenAI/Oracle Project Jupiter Stargate campus in Santa Teresa, Doña Ana County, New Mexico, extending on-site gas-powered capacity toward the campus's multi-gigawatt build-out.
13.11 miles University of Texas: El Paso
The University of Texas is planning to build a new $3 million data center for the College of Education.
14.24 miles Lumen El Paso 1
14.27 miles Flō Networks El Paso
14.30 miles Lumen El Paso 2
14.41 miles East PlazaInterested in this information?Contact us
Sangha Renewables' West Texas data center is operational. The facility is a Bitcoin mining site powered directly by a large-scale solar energy facility located on the same 5.5-acre plot.

Lumen Santa Teresa Data Center Photos See all

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
115
Markets
279MW
Megawatts

News See all

Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read New Era Plans 7GW AI Facility in Lea County, New Mexico
New Era Plans 7GW AI Facility in Lea County, New Mexico

New Era Plans 7GW AI Facility in Lea County, New Mexico

November 06, 2025 New Mexico

New Era Energy & Digital has signed a land option purchase agreement for around 3,500 acres in Lea County, New Mexico, with plans to develop an up to 7GW AI data center campus powered by natural gas and nuclear energy.According to New Era, the Lea County location was selected due to its...

Read more
Read Stack Joins Multi-Billion-Dollar Data Center Project in New Mexico
Stack Joins Multi-Billion-Dollar Data Center Project in New Mexico

Stack Joins Multi-Billion-Dollar Data Center Project in New Mexico

August 30, 2025 New Mexico

Stack this week announced its role in Project Jupiter, a proposed large data center campus in Doña Ana County. Stack is collaborating with BorderPlex Digital Assets, with the two companies aiming to invest up to $165 billion over the entire project. Stack hasn’t detailed its exact role in the...

Read more
Read Zenith Obtains Planning Approval for 1.24GW Data Center Project
Zenith Obtains Planning Approval for 1.24GW Data Center Project

Zenith Obtains Planning Approval for 1.24GW Data Center Project

August 27, 2025 New Mexico

US energy infrastructure developer Zenith Volts has been granted approval from the Chaves County Commission for a 300-acre data center project designed to support 1.24GW or more of power capacity. The entire site will span 8,500 acres and integrate advanced power solutions, including on-site...

Read more
Read Meta, XGS Signs 150MW Geothermal Deal in New Mexico
Meta, XGS Signs 150MW Geothermal Deal in New Mexico

Meta, XGS Signs 150MW Geothermal Deal in New Mexico

June 14, 2025 New Mexico

Social network firm Meta has signed an agreement with enhanced geothermal energy firm XGS Energy to support the development and deployment of a 150MW project in New Mexico.This project is expected to supply energy to the PNM electrical grid and power Meta’s data center portfolio across New...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?