Grupo Aire OASIX: Lisbon

Latest Podcast
Edifício Diogo Cão
Operational
Fully operational facility
Operated by:

Grupo Aire OASIX: Lisbon

Year Built: 2011
░░░ Request Dataset MW
Total Power
░░░░░ Login to view SqFt
Gross Colocation Size

The Grupo Aire OASIX Lisbon data center, operational since 2011, spans over 470 m² and houses more than 150 racks.

Map and Nearby Locations:

Edifício Diogo Cão
Oasix | Grupo Aire Sites
Nearby Facilities

Sites within 15 miles of Grupo Aire OASIX: Lisbon

Distance Site About
2.30 miles Portugal Telecom Lisboa
3.61 miles Ar Telecom: Lisbon
Portuguese telco AR Telecom operates a new data center in Alfragide, Lisbon. The initial phase of the facility covers 1,400 square meters (15,000 square feet).
3.62 miles AtlasEdge: LIS002
This planned facility will be part of AtlasEdge's Lisbon campus in Portugal.
3.63 miles AtlasEdge: Lisbon LIS001
In April 2024, the company announced its entry into the Portuguese market by acquiring two adjacent sites in Carnaxide
3.69 miles NOS: Imopolis I
3.73 miles NOS: Imopolis II
In 2018, the Portuguese telecoms and media company NOS launched a new data center, Imopolis II, in Carnaxide, Oeiras (part of the Lisbon Metropolitan Area).
4.12 miles FCCN Lisbon
4.86 miles Oni: Matinha, Lisbon
6.33 miles Equinix: LS2
This new facility offers 2,050 square meters (22,065 sq ft) of co-location space across three floors, with an initial capacity of 625 racks.
6.36 miles Equinix Lisbon LS1
7.10 miles Tata Portugal Seixal
7.58 miles Digital Realty: Lisbon
Digital Realty’s 2.4MW Lisbon facility in Carnaxide, acquired for $8.3M and expected to be online in 2027, serves as a subsea-connected interconnection node near the Carcavelos cable landings, supporting its Southern Europe expansion strategy.
11.97 miles Voltekko: Alcochete
Voltekko Group is launching its first eco-responsible data center in Alcochete, Portugal. This purpose-built facility is slated to open in the third quarter of 2026.

Grupo Aire OASIX: Lisbon Data Center Photos (See all)

Operating Company

Operated by:
8
Facilities
0
Markets
3MW
Megawatts

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?