Equinix: LS2

Latest Podcast
Av. Severiano Falcão 14
Operational
Fully operational facility
Operated by:

Equinix: LS2

Short Code: LS2
Year Built: 2025
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Equinix launched its second Lisbon data center in 2025. This new facility, representing an initial investment of around €50 million ($57.1 million) and an estimated total of €100 million ($114.2 million), offers 2,050 square meters (22,065 sq ft) of co-location space across three floors, with an initial capacity of 625 racks.

Space


  • Colocation Space: 22,066ft2 (2,050m2) at full build
  • Building Type: Three story concrete structure
  • Floor Type: Concrete
  • Floor Load Capacity: 177.53psf (8.5kN/m2)
  • Covered by 100% renewable energy

Power


  • Utility Feeders: 2
  • UPS Configuration: Block redundant
  • UPS Redundancy: N+1 Block Redundant
  • Standby Power Configuration: 6 x 2.25 MVA Diesel Engines (at full build)
  • Standby Power Redundancy: N+1

Certifications


▪ ISO 22301
▪ ISO 27001
▪ ISO 9001
▪ PCI DSS
▪ SOC 1 Type II
▪ SOC 2 Type II
▪ ISO 14001
▪ ISO 45001
▪ ISO 50001

Map and Nearby Locations:

Av. Severiano Falcão 14
Equinix Sites
Nearby Facilities

Sites within 15 miles of Equinix: LS2

Distance Site About
0.03 miles Equinix Lisbon LS1
2.22 miles FCCN Lisbon
3.08 miles Oni: Matinha, Lisbon
4.08 miles Portugal Telecom Lisboa
6.33 miles Grupo Aire OASIX: Lisbon
The Grupo Aire OASIX Lisbon data center, operational since 2011, spans over 470 m² and houses more than 150 racks.
6.43 miles Ar Telecom: Lisbon
Portuguese telco AR Telecom operates a new data center in Alfragide, Lisbon. The initial phase of the facility covers 1,400 square meters (15,000 square feet).
7.20 miles NOS: Imopolis II
In 2018, the Portuguese telecoms and media company NOS launched a new data center, Imopolis II, in Carnaxide, Oeiras (part of the Lisbon Metropolitan Area).
7.21 miles NOS: Imopolis I
7.26 miles AtlasEdge: LIS002
This planned facility will be part of AtlasEdge's Lisbon campus in Portugal.
7.33 miles AtlasEdge: Lisbon LIS001
In April 2024, the company announced its entry into the Portuguese market by acquiring two adjacent sites in Carnaxide
9.18 miles Voltekko: Alcochete
Voltekko Group is launching its first eco-responsible data center in Alcochete, Portugal. This purpose-built facility is slated to open in the third quarter of 2026.
11.91 miles Digital Realty: Lisbon
Digital Realty’s 2.4MW Lisbon facility in Carnaxide, acquired for $8.3M and expected to be online in 2027, serves as a subsea-connected interconnection node near the Carcavelos cable landings, supporting its Southern Europe expansion strategy.
13.08 miles Tata Portugal Seixal
16.16 miles Edged Energy: LIS04
The facility is a part of Edged Energy's Lisbon Campus in Portugal.
16.21 miles Edged Energy: LIS05
The facility is a part of Edged Energy's Lisbon Campus in Portugal.
16.31 miles Edged Energy: LIS03
The facility is a part of Edged Energy's Lisbon Campus in Portugal.
16.42 miles Edged Energy: Lisbon
Real estate firm Merlin Properties and data center company Edged Energy has started construction of a new campus in Lisbon, Portugal.
16.43 miles Edged Energy: LIS02
The facility is a part of Edged Energy's Lisbon Campus in Portugal.
16.46 miles Merlin: Lisbon
Real estate firm Merlin Properties and data center company Edged Energy has started construction of a new campus in Lisbon, Portugal. The campus will be constructed in phases with the first of five facilities expected to come online in 2027.

Equinix: LS2 Data Center Photos (See all)

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

313
Facilities
45
Markets
2036MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?