Under Construction
New facility under construction
Operated by:

Google: Project Mica

Short Code: Rocky Branch Creek
Year Planned: 2027
Lot Size: 493 acres

Sites on this Campus:

Google is developing its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.

Port KC has authorized up to $10 billion in taxable revenue bonds to finance the project and has granted substantial tax incentives (25-year, 75% property tax exemption, and 100% sales tax exemptions).

  • In late 2023, Google acquired nearly 500 acres for the project, located northeast of Interstate 435 and US Highway 169.
  • Construction is slated to start in 2025, proceeding in phases. The first building is expected to be completed within 18 months of site activity.
  • The 500-acre, 1.56 million-square-foot campus will feature five hyperscale data center buildings designed to handle extensive digital data processing.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

South HubInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CoreInterested in this information?Contact us

Distance Site About
0.29 miles GlobalInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
0.45 miles Park ThreeInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
0.53 miles ThreeInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
0.69 miles Edge CampusInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
1.18 miles ProInterested in this information?Contact us
This facility is part of Meta's Kansas City Campus in Missouri.
1.30 miles Park UltraInterested in this information?Contact us
This facility is part of Meta's Kansas City Campus in Missouri.
1.38 miles Station GammaInterested in this information?Contact us
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
5.74 miles Lincoln Rackhouse KC (Airworld)
The campus is a former Bank of America facility in Kansas City’s northland.
5.94 miles Rackspace Kansas City MC1
Raised Flooring: 15,256 sq ft 2.5 MW Total Utility Power Manned 24x7x365
6.50 miles TierPoint Kansas City
Outside of 500-year flood plain 6kW per cabinet capacity Newly upgraded 2MVA utility power feed 1MW diesel generator for all critical loads 2N UPS with redundant battery strings
6.92 miles StationInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
7.04 miles Valley OneInterested in this information?Contact us
Project Kestrel, a major new data center development, is officially taking flight in Kansas City, Missouri, following the acquisition of 430 acres of land near the Kansas City International Airport by Google affiliate Shenandoah Computing LLC.
7.37 miles North TowerInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
7.47 miles Metro PointInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
7.77 miles Central RidgeInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
7.86 miles Valley MaxInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
10.19 miles Metrobloks: MCI-A2
This facility is part of the Metrobloks Kansas City campus in Missouri.
10.20 miles Metrobloks: Kansas City MCI-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q3 2027.
10.26 miles Metrobloks: MCI-A3
This facility is part of the Metrobloks Kansas City campus in Missouri.
11.17 miles Center MaxInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
11.32 miles Global TowerInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
11.48 miles Global CampusInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
11.81 miles EastInterested in this information?Contact us
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
12.83 miles NOCIX
12.87 miles Nocix 2 (1530 Swift)
12.88 miles LightEdge Kansas City
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
12.88 miles Edged Energy: Kansas City, MO
The facility known as Edged Kansas City is located in Kansas City, Missouri.
15.33 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
15.36 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
15.36 miles Lumen Kansas City 4
15.36 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
15.38 miles Lumen Kansas City 1
15.61 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
15.78 miles Nebius: Kansas City
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
15.80 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
15.87 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
16.07 miles Lumen Kansas City 3

Station BetaInterested in this information?Contact us Data Center Photos See all

Google bought 500 acres of land for "Project Mica"
Source: Google Maps

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

237
Facilities
75
Markets

News See all

Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres
Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said...

Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres

July 27, 2026 Google

Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said Verizon expects to announce additional deals later this year that could generate "multiple billions...

Read more
Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?