Google Advances Plans for its First French Data Center
April 13, 2026
Google subsidiary Pearl Computing Malaysia will lease a data center from Sime Darby Property in a major real estate deal. Sime's subsidiary SDP EBP II will develop the 77-acre facility at Elmina Business Park in Klang Valley near Kuala Lumpur. The project completion is targeted for December 2027.
The initial 20-year lease includes two 5-year extension options. Expected rental income over the initial term is RM5.6 billion ($1.25bn). Pearl Computing is owned by Raiden APAC Pte. Ltd.
| Distance | Site | About |
|---|---|---|
| 0.22 miles | Hyperscale Data Center Request Dataset |
Google operates its first Malaysian data center, located at the Elmina Business Park on the outskirts of Kuala Lumpur.
|
| 6.40 miles | Hyperscale Data Center Request Dataset |
Google, via its affiliate Pearl, is acquiring 58.1 acres in Eco Park from Paragon Pinnacle, a subsidiary of Malaysian real estate firm EcoWorld, for RM266.1 million ($60.1 million).
|
| 6.94 miles | Hyperscale Data Center Request Dataset |
Google, through its subsidiary Pearl Computing, leased 92.44 acres in Eco Business Park V, Selangor, from EcoWorld to develop data center facilities.
|
| 9.61 miles | Exitra: Kuala Lumpur | |
| 9.81 miles | EdgeConneX: CBD Kuala Lumpur |
EdgeConnex is building a 19,200 sqm data center with in the Central Business District in Malaysia.
|
| 9.87 miles | TM KELANA JAYA DATA CENTRE (KJDC) |
|
| 9.94 miles | Safehouse: Wisma Mont’ Kiara |
Launched in 2011, the 5,000 sq ft facility utilizes IBM's Scalable Modular Data Centre Solutions (SMDC) and incorporates technology from Schneider Electric and Juniper Networks.
|
| 10.18 miles | Basis Bay: Glenmarie DC2 | |
| 10.30 miles | Basis Bay: Glenmarie DC1 |
Basis Bay's Glenmarie DC.1 (also referred to as Subang Hi-Tech DC.1) is one of the company's established, purpose-built facilities located in Shah Alam, Malaysia.
|
| 10.69 miles | EC31 Kuala Lumpur | |
| 11.17 miles | Strateq: Petaling Jaya |
|
| 11.35 miles | MyTelehaus Kuala Lumpur P33 Centre | |
| 11.38 miles | Strateq: Shah Alam I-City |
|
| 11.40 miles | i-Berhad: i-City Bldg-1 |
Located in the heart of Shah Alam, i-Berhad’s Building 1 (also known as Block M) serves as the foundation for the i-City Data Centre Park.
|
| 11.58 miles | i-Berhad: i-City Bldg-3 |
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
|
| 11.61 miles | i-Berhad: i-City Bldg-2 |
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
|
| 11.73 miles | YTL: Sentul 1 |
YTL’s Sentul Data Center 1 is located in the heart of Kuala Lumpur.
|
| 11.75 miles | NEXTDC KL1 Petaling Jaya |
Once completed, KL1 will be the first Uptime Institute (UI) Tier IV certified data centre facility in Peninsular Malaysia.
|
| 12.95 miles | Crypto Mining Data Center Request Dataset |
This facility is part of Bitdeer's Kuala Lumpur campus in Malaysia.
|
| 12.95 miles | Crypto Mining Data Center Request Dataset |
|
| 12.95 miles | Crypto Mining Data Center Request Dataset |
This facility is part of Bitdeer's Kuala Lumpur campus in Malaysia.
|
| 13.38 miles | TM Brickfields Data Centre (BFDC) |
|
| 13.71 miles | AIMS: KL2 |
AIMS Group, owned by DigitalBridge, expanded its Malaysian footprint in 2024 with the launch of Bangunan AIMS (also known as KL2) in Kuala Lumpur.
|
| 13.77 miles | AIMS Kuala Lumpur Menara |
|
| 15.46 miles | Exsim: Bukit Jalil |
The EXSIM Hyperscale Data Center Project in Bukit Jalil, Malaysia, complies with Uptime Institute's Tier III/Tier IV standards.
|
| 16.56 miles | EdgeConneX: Bukit Jalil |
EdgeConnex is building a 60,000 sqm data center in Bukit Jalil, Malaysia. The site will feature a 132 kV substation.
|
| 17.15 miles | Bridge Data Centres MY03 |
Bridge DC announced plans for the first building at the MY03 Campus in 2021.
|
| 17.17 miles | Bridge: MY03 DC4 |
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
|
| 17.21 miles | Bridge: MY03 DC2 |
Phase One of the expansion was planned to be ready for service by Q3 2025.
|
| 17.23 miles | Bridge: MY03 DC3 |
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
|
April 13, 2026
April 07, 2026
March 27, 2026
March 27, 2026
March 11, 2026
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas