Equinix Begins Construction on DB7x Data Center in Dublin
March 30, 2026
Equinix
The site was built in 2015 by Metronode. In 2018, it was acquired by Equinix.
| Distance | Site | About |
|---|---|---|
| 0.64 miles | ADC: Mitchell |
|
| 3.37 miles | NEXTDC Canberra C1 | |
| 8.38 miles | Telstra: Deakin, Canberra |
|
| 8.61 miles | CDC Fyshwick 2 | |
| 8.79 miles | Macquarie IC4 Bunker |
Macquarie Data Centres' Canberra Bunker Campus is built specifically for the Australian Government and its partners.
|
| 8.79 miles | Macquarie: IC5 Bunker |
Opened in Dec 2020, IC5 is a new facility built specifically for the Government within the Macquarie Canberra Data Centre Campus.
|
| 9.31 miles | CDC Fyshwick 1 | |
| 10.01 miles | CDC: Beard BE1 |
Canberra Data Centres (CDC) operates a data center in Beard, Australia.
|
| 12.36 miles | DCI Canberra CBR01 |
Brookfield-owned DCI Data Centers has submitted a planning application to construct a 5,826 sqm (62,710 sq ft) data center within the Poplars Innovation Precinct in Jerrabomberra.
|
| 12.59 miles | CDC Hume 3 | |
| 12.60 miles | CDC Hume 2 | |
| 12.65 miles | CDC Hume 1 | |
| 13.00 miles | CDC: Hume 5 |
CDC operates two campuses in Hume. Hume Campus Two represents two data center buildings, Hume 4 & Hume 5. Hume 5 is the second data center building of the campus.
|
| 13.05 miles | CDC: Hume 4 |
CDC operates two campuses in Hume. Hume Campus Two represents two data center buildings, Hume 4 & Hume 5. Hume 4 is the first building of the campus with Tier 4 specification.
|
| 13.67 miles | Stack: Canberra |
Stack Infrastructure has acquired a 24,000 sqm (258,300 sq ft) site in Canberra and plans to build hyperscale data center there.
|
March 30, 2026
Equinix
January 29, 2026
Equinix
January 26, 2026
Equinix
December 19, 2025
Equinix
December 06, 2025
Equinix
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas