E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026
Eric Bell
World
The electrical infrastructure can support power densities of up to 33kW per rack. Designed for complete control and infallible supply, our grid has an initial single feed then dual High Voltage lines incoming from diverse routes. Dedicated power transformers in an N+1 configuration provide 7MVA capacity. Busways in the data hall have A and B feeds to each rack. .
The electrical infrastructure has been designed to be a 2N configuration. Australian Data Centres is the only Australian privately owned High Voltage site in the ACT, allowing total control over onsite transformers. Full configuration includes five Eurodiesel 2.25 MVA Diesel Rotary UPS units onsite.
| Distance | Site | About |
|---|---|---|
| 0.64 miles | Equinix: Canberra CA1 |
The site was built in 2015 by Metronode. In 2018, it was acquired by Equinix.
|
| 3.67 miles | NEXTDC Canberra C1 | |
| 8.28 miles | CDC Fyshwick 2 | |
| 8.37 miles | Telstra: Deakin, Canberra |
|
| 8.48 miles | Macquarie IC4 Bunker |
Macquarie Data Centres' Canberra Bunker Campus is built specifically for the Australian Government and its partners.
|
| 8.48 miles | Macquarie: IC5 Bunker |
Opened in Dec 2020, IC5 is a new facility built specifically for the Government within the Macquarie Canberra Data Centre Campus.
|
| 8.97 miles | CDC Fyshwick 1 | |
| 9.59 miles | CDC: Beard BE1 |
Canberra Data Centres (CDC) operates a data center in Beard, Australia.
|
| 12.02 miles | DCI Canberra CBR01 |
Brookfield-owned DCI Data Centers has submitted a planning application to construct a 5,826 sqm (62,710 sq ft) data center within the Poplars Innovation Precinct in Jerrabomberra.
|
| 12.32 miles | CDC Hume 3 | |
| 12.33 miles | CDC Hume 2 | |
| 12.37 miles | CDC Hume 1 | |
| 12.74 miles | CDC: Hume 5 |
CDC operates two campuses in Hume. Hume Campus Two represents two data center buildings, Hume 4 & Hume 5. Hume 5 is the second data center building of the campus.
|
| 12.80 miles | CDC: Hume 4 |
CDC operates two campuses in Hume. Hume Campus Two represents two data center buildings, Hume 4 & Hume 5. Hume 4 is the first building of the campus with Tier 4 specification.
|
| 13.44 miles | Stack: Canberra |
Stack Infrastructure has acquired a 24,000 sqm (258,300 sq ft) site in Canberra and plans to build hyperscale data center there.
|
Australian Data Centres entered the market in 2010 and was commissioned to operational status in 2014.
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas