ADC: Mitchell

Latest Podcast
38 Vicars St
Operational
Fully operational facility
Operated by: ADC

ADC: Mitchell

░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

The electrical infrastructure can support power densities of up to 33kW per rack. Designed for complete control and infallible supply, our grid has an initial single feed then dual High Voltage lines incoming from diverse routes. Dedicated power transformers in an N+1 configuration provide 7MVA capacity. Busways in the data hall have A and B feeds to each rack. .

The electrical infrastructure has been designed to be a 2N configuration. Australian Data Centres is the only Australian privately owned High Voltage site in the ACT, allowing total control over onsite transformers. Full configuration includes five Eurodiesel 2.25 MVA Diesel Rotary UPS units onsite.

Map and Nearby Locations:

38 Vicars St
ADC Sites
Nearby Facilities

Sites within 15 miles of ADC: Mitchell

Distance Site About
0.64 miles Equinix: Canberra CA1
The site was built in 2015 by Metronode. In 2018, it was acquired by Equinix.
3.67 miles NEXTDC Canberra C1
8.28 miles CDC Fyshwick 2
8.37 miles Telstra: Deakin, Canberra
8.48 miles Macquarie IC4 Bunker
Macquarie Data Centres' Canberra Bunker Campus is built specifically for the Australian Government and its partners.
8.48 miles Macquarie: IC5 Bunker
Opened in Dec 2020, IC5 is a new facility built specifically for the Government within the Macquarie Canberra Data Centre Campus.
8.97 miles CDC Fyshwick 1
9.59 miles CDC: Beard BE1
Canberra Data Centres (CDC) operates a data center in Beard, Australia.
12.02 miles DCI Canberra CBR01
Brookfield-owned DCI Data Centers has submitted a planning application to construct a 5,826 sqm (62,710 sq ft) data center within the Poplars Innovation Precinct in Jerrabomberra.
12.32 miles CDC Hume 3
12.33 miles CDC Hume 2
12.37 miles CDC Hume 1
12.74 miles CDC: Hume 5
CDC operates two campuses in Hume. Hume Campus Two represents two data center buildings, Hume 4 & Hume 5. Hume 5 is the second data center building of the campus.
12.80 miles CDC: Hume 4
CDC operates two campuses in Hume. Hume Campus Two represents two data center buildings, Hume 4 & Hume 5. Hume 4 is the first building of the campus with Tier 4 specification.
13.44 miles Stack: Canberra
Stack Infrastructure has acquired a 24,000 sqm (258,300 sq ft) site in Canberra and plans to build hyperscale data center there.

ADC: Mitchell Data Center Photos (See all)

Operating Company

Operated by: ADC

Australian Data Centres entered the market in 2010 and was commissioned to operational status in 2014.

1
Facilities
0
Markets
6MW
Megawatts

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?