Digital Realty: Melbourne 72 Radnor

Latest Podcast 72 Radnor Dr
Operational
Fully operational facility
Operated by:

Digital Realty: Melbourne 72 Radnor

Short Code: MEL11
Year Built: 2012
Floors: 1
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

The 3.00 hectare location has 2 buildings and is approximately 16km North West of Melbourne CBD and offers excellent diversity from a power and connectivity perspective.

The first facility was completed in late 2012 and is presently fully leased to a leading Australian bank. The second facility launched in late 2013.

Melbourne I is at 98 Radnor Drive and is fully leased to an Australian bank
Melbourne II is at 72 Radnor Drive

Map and Nearby Locations

72 Radnor Dr
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: Melbourne 72 Radnor Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: Melbourne 72 Radnor

Distance Site About
0.07 miles Digital Realty: MEL12
0.09 miles Digital Realty: MEL10
0.64 miles Equinix ME4
1.35 miles Airtrunk: MEL1 Bldg-2
1.35 miles Datacom: AirTrunk MEL1
AirTrunk MEL1 is the largest data centre in Victoria (by MW capacity). Datacom's colocation suite at MEL1 is part of its trans-Tasman interconnected data centre network that spans Datacom's two Australian locations and four New Zealand data centres.
1.35 miles Airtrunk: MEL1 Bldg-1
AirTrunk is expanding its Melbourne campus. This expansion will include the construction of the remaining three phases of the six phases in MEL1 campus that will deliver over 100MW of new IT load.
2.95 miles STACK: MEL02B
MEL02B is the second phase of STACK Infrastructure's MEL02 data center on Palmers Road in Truganina, in Melbourne's west.
3.01 miles STACK: MEL02A
MEL02A is the first phase of STACK Infrastructure's MEL02 data center on Palmers Road in Truganina, in Melbourne's west.
3.15 miles STACK: MEL01A
In 2023, Stack Infrastructure announced the completion of its first Asia Pacific (APAC) data center, known as MEL01.
3.19 miles STACK: MEL01B
MEL01B is the second data center building of Stack Infrastructure's Melbourne campus.
3.23 miles STACK: MEL01C
This facility is part of Stack Infrastructure's MEL01 campus in Melbourne.
3.28 miles STACK: MEL01D
This facility is part of Stack Infrastructure's MEL01 campus in Melbourne.
3.60 miles Hyperscale Data CenterInterested in this information?Contact us
3.89 miles Stockland: Melbourne Campus
Stockland has filed a planning permit application to develop a data center campus in Laverton, Melbourne.
4.16 miles Valley GammaInterested in this information?Contact us
4.20 miles CDC: Laverton Campus
Construction has officially begun on CDC's $2.7 billion Laverton data campus in Melbourne, with groundbreaking taking place in February 2025.
4.41 miles CDC: Brooklyn 1
CDC’s Brooklyn campus expansion in Melbourne, formally opened in early 2026 at an existing site that has operated since 2024, adds about 155MW and brings two operational facilities online, with a third planned and total campus capacity targeted at 350MW+
4.47 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.66 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.83 miles Stockland: Brooklyn, Melbourne
Australian property group Stockland plans to develop a data center campus in Brooklyn, Melbourne.
5.04 miles NEXTDC: M3West Footscray
In 2022, NextDC launched M3, the company's third data center in Melbourne, the capital city of Victoria, Australia. The facility is located in West Footscray, about 10km west of Melbourne's Central Business District.
5.13 miles Centuria: Yarraville
Centuria Industrial REIT acquired the warehouse site at 1 Hardie Road and 2-8 Cawley Road, Yarraville, in late 2025 for A$30.2 million.
5.14 miles Edge ValleyInterested in this information?Contact us
5.25 miles West PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.65 miles Goodman: RBR Hub
5.65 miles PGIM: Melbourne Campus
PGIM Real Estate has expanded its digital infrastructure footprint with the acquisition of a 20.7-hectare site in a western suburb of Melbourne, marking the first Australian investment for its $2 billion Global Data Center Fund.
6.82 miles AirTrunk: MEL2 Expansion
6.86 miles GreenSquare: Melbourne Campus
Australian data center firm GreenSquare is expanding into Melbourne with plans for a new hyperscale campus, designated as MEL1, located on a former petrochemical storage site in Spotswood.
6.95 miles AirTrunk: Melbourne MEL2
Leading APAC data center developer AirTrunk has finalized the acquisition of a new site in Melbourne for its second regional campus, MEL2.
7.19 miles Vantage Melbourne MEL1
Vantage is building one multi-story data center on its MEL1 site in Tullamarine, Melbourne.
7.35 miles NEXTDC: M2 Melbourne Tullamarine
M2 Melbourne is a Tier IV certified data centre situated in Tullamarine, conveniently located near major transport and telecommunications infrastructure.
7.91 miles NEXTDC: M4 Melbourne
This Tier IV data center will encompass 50,000 square meters and include an AI Factory.
8.01 miles Equinix Melbourne ME2
8.04 miles Equinix Melbourne ME1
8.47 miles WestInterested in this information?Contact us
8.88 miles NEXTDC: M1 Melbourne
NEXTDC's M1 facility is the best-connected data centre in Melbourne and is certified to UTI Tier III standard.
8.89 miles Carrier-Neutral Data CenterInterested in this information?Contact us
8.98 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.28 miles Interactive Melbourne
9.76 miles Equinix ME5
The company acquired from Metronode in 2018.
10.08 miles Vocus: MEL03
VDC-MEL03 data center is located at 530 Collins Street in Melbourne. The company moved into the former ASX building in 2013 and said at the time it could build out to 400 racks.
10.08 miles MDC 530 Collins
10.10 miles Vocus Melbourne (55 King) [Site Closed]
10.37 miles ADC: Melbourne campus
Australian Data Centres (ADC) is planning an AI-optimised campus in Melbourne.
10.66 miles Telstra: Exhibition
The Exhibition data center is located in Melbourne's CBD. It's one of two Telstra InfraCo data centers in Melbourne. The facility offers colocation services and is connected to its counterpart via fiber networks.
11.06 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.57 miles Zerra DC: Melbourne Campus
Zerra DC has filed a planning permit application with the state of Victoria to develop a six-building data center campus in Campbellfield, north of Melbourne, Australia.
14.37 miles Centuria: Thomastown Keon Park
Thomastown and Keon Park is CIP’s largest data centre conversion site, a 10.6 hectare industrial holding about 17 km north of Melbourne’s CBD and less than 100 metres from the Thomastown terminal station.
16.64 miles Goodman: Craigieburn

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to build...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Starts Construction of KIX15 Data Center in Japan
Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty...

Digital Realty Starts Construction of KIX15 Data Center in Japan

October 09, 2026 Digital Realty Trust

Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty and Mitsubishi Corporation, KIX15 will be the campus’s fifth building. Operations are expected to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?