Digital Halo's first project occupies a 3.75-hectare (9.3-acre) plot in Cainta, a town in Rizal province near the eastern edge of Metro Manila. The first phase, which went online in 2023, involved renovating an existing industrial building to house server racks. The project will be developed in stages based on customer demand.
Campus Features
- Incoming Feeds: 2 x 34.5kV incoming for MNL1 & 1 x expandable to 115kV for entire campus
- Redundancy: N+1 redundant primary and emergency generators
- UPS Configuration: with N+1 and no single point of failure
- Design PUE: <1.45
- Floor Loading 15kN/sqm
- Ceiling Height 7.0M (slab to slab)
Certifications & Compliance
- ISO Certifications (ISO9001, ISO27001, ISO50001, ISO14001)
- Threat, Vulnerability and Risk Assessment (TVRA)
- Uptime Institute Tier III Design
- Green and sustainability certification (EDGE, Green Mark)