CyrusOne Dublin I

Latest Podcast Conchobar Murray Avenue
Operational
Fully operational facility
Operated by:

CyrusOne Dublin I

Short Code: Building 1
Year Built: 2021
Floors: 2
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys. Construction of the first phase began in September 2019 and 12MW went live in 2021. On 14th July 2023, CyrusOne filed to extend their permission to build a 32,419 m2, two-storey data centre in the Grange Castle Business Park, adjacent to the company's existing facility (Dublin I). In September, permission was refused.

  • 11,148 sq m (120,000 sq ft) of technical space across two separate floors within each of the three buildings on campus
  • Highly resilient, concurrently maintainable power and cooling to Tier III
  • Dedicated electrical plant to each floor
  • Low PUE through the use of free cooling chillers
  • 900 mm heavy duty raised floor with 4,200 mm clear height in the data hall
  • Active / Active dual redundant power supplies of 80 MVA
  • Carrier neutrality and diverse fibre connectivity from multiple providers
  • Secure managed delivery bay with 3 tonne goods lift
  • Multi-layer industry leading levels of physical and electronic security with 24/7 year round onsite support

Map and Nearby Locations

Conchobar Murray Avenue
CyrusOne Sites
Nearby Facilities

CyrusOne Dublin I Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CyrusOne Dublin I

Distance Site About
0.09 miles CyrusOne : DUB I Bldg 2
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
0.11 miles CyrusOne : DUB I Bldg 3
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
0.13 miles Global RidgeInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
0.20 miles Metro ValleyInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
0.23 miles Plaza GammaInterested in this information?Contact us
Google's second data center in Dublin is located at Google's Profile Park data center campus in Grange Castle.
0.24 miles Station AlphaInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
0.34 miles Station BetaInterested in this information?Contact us
The two new facilities, DUB14 & DUB15, are located west of the company's DUB9, DUB10, DUB12, and DUB13 data centers on the Microsoft Dublin Grange Castle campus.
0.39 miles Center OneInterested in this information?Contact us
In June 2024, Google submitted a planning application to build a 72,400 sqm (779,310 sq ft) data center on a 50-acre site adjacent to its existing two facilities at Grange Castle Business Park in South Dublin.
0.42 miles UltraInterested in this information?Contact us
Google opened its first Irish data center in Dublin at Profile Park, Grange Castle in 2012.
0.42 miles TowerInterested in this information?Contact us
The two new facilities, DUB14 & DUB15, are located west of the company's DUB9, DUB10, DUB12, and DUB13 data centers on the Microsoft Dublin Grange Castle campus.
0.43 miles North HubInterested in this information?Contact us
0.46 miles South TowerInterested in this information?Contact us
0.48 miles Vantage: DUB 12
This facility is part of Vantage's DUB1 Campus in Dublin, Ireland.
0.49 miles Vantage: Dublin DUB1
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
0.51 miles Center PrimeInterested in this information?Contact us
0.56 miles Plaza UltraInterested in this information?Contact us
0.57 miles Prime CenterInterested in this information?Contact us
0.60 miles Vantage: DUB 13
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
0.61 miles Digital Profile Park Dublin
Digital Realty owns the 10 acre site at Profile Park and will have access to both power and fiber. The company has secured planning approval to construct 193,384 gross sq ft in two phases and over four buildings.
0.61 miles Digital Realty: DUB14
Digital Realty opened its second data center on the Profile Park campus in Dublin, Ireland in 2019.
0.62 miles Digital Realty: DUB15
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
0.63 miles Digital Realty: DUB16
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
0.65 miles West PointInterested in this information?Contact us
0.68 miles EdgeConnex DUB04
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
0.68 miles Equinix Dublin DB2
Located in Grange Castle business park, DB2 is a former Telecity site that was acquired by Equinix in January 2016.
0.70 miles MetroInterested in this information?Contact us
0.71 miles Equinix: DB8
Equinix was planning to construct a facility at Profile Park, Nangor Road, Clondalkin in Dublin. The site was originally planned to be powered by the electric grid, but after failing to secure a permanent supply, Equinix adjusted the proposal to use gas power.
0.78 miles Edgeconnex Dublin
EdgeConnex initially built a 4,500sqm data centre (DUB01) in 2016 and later extended that facility further before adding a new 1,500sqm data hall in 2017.
0.79 miles MaxInterested in this information?Contact us
0.83 miles OneInterested in this information?Contact us
Commissioned in 2009, the site was Microsoft's first data center outside of the United States.
0.85 miles EdgeConnex DUB05
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
0.85 miles Edgeconnex: DUB02
0.91 miles Edgeconnex: DUB03
1.01 miles Digital Realty: DUB4
Digital Realty's DUB4 data center is situated in Grand Castle Park, Dublin, next to its DUB3 facility.
1.05 miles Digital Realty: DUB3
Located in the Grange Castle data centre cluster, the DUB3 data center offers 59,202 sqft of space and power densities of up to 2kW per square meter, with 4.6MW available for the entire data center.
1.07 miles CyrusOne Dublin Grange Castle
Approved in October 2018, CyrusOne is building a three building campus with 74 MW of power.
1.20 miles Echelon: DUB 40
Echelon Data Centres’ DUB40 is planned to be located outside of Dublin, in a data center cluster known as Grange Castle.
2.08 miles Equinix Dublin DB1
2.08 miles Equinix: Citywest Dublin
The BT data centre is adjacent to Equinix's DB1 site.
2.37 miles K2: DUB 6
K2 Data Centers completed the purchase of a 4.6-acre site in Citywest Business Park, Dublin, in July 2020 for approximately €3 million.
2.43 miles Keppel DC Dublin1
2.43 miles Station MaxInterested in this information?Contact us
3.11 miles Echelon: DUB13
Echelon Data Centres has challenged a South Dublin County Council (SDCC) ruling to block the expansion of its DUB10 data center campus in Clondalkin, Dublin, Ireland.
3.19 miles Echelon Clondalkin
Echelon’s DUB10 campus will provide 90MW+ of IT load and includes a grid substation as well as on-site power generation.
3.20 miles Echelon: DUB11
Echelon's DUB11 marks the second building of its Clondalkin campus, following the energization of the first building in Q4 2023.
3.22 miles Echelon: DUB12
Echelon's DUB12 marks the third building of its Clondalkin campus.
3.91 miles North TowerInterested in this information?Contact us
3.93 miles Digital Realty: Dublin 1
3.93 miles Digital Realty: Dublin 2
3.97 miles TwoInterested in this information?Contact us
4.57 miles Valley AlphaInterested in this information?Contact us
4.60 miles Plaza AlphaInterested in this information?Contact us
The Amazon AWS site is a former Tesco storage facility at Greenhills Industrial Estate in Dublin 24.
4.69 miles Plaza MaxInterested in this information?Contact us
6.88 miles Kyndryl: Dublin
6.99 miles NorthInterested in this information?Contact us
Facebook broke ground on the Clonee data centre in 2016 and the first building became operational in December 2017. The centre is built on a 250-acre site that was formerly two farms adjoining the headquarters of the Kepak meat business.
7.02 miles Core StationInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
7.04 miles Station BetaInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
7.05 miles Equinix: DB5x
Equinix's fifth data center in Ireland opened in Q4 2022, located in the former Clyde House in Blanchardstown.
7.06 miles OneInterested in this information?Contact us
7.06 miles Equinix: DB6x
DB6x is part of a three-building campus(DB5x, DB6x, DB7x) proposed in a 2020 planning application.
7.07 miles South StationInterested in this information?Contact us
7.08 miles Equinix: DB7x
Equinix has begun construction of its DB7x data center at its Blanchardstown campus in Profile Park, Grange Castle Business Park, Clondalkin, Dublin, Ireland, with the facility expected to deliver initial capacity by early 2028. Based on cost benchmarks, the project is estimated to provide 9MW of IT load, serving as a retail IBX expansion leveraging existing campus infrastructure.
7.10 miles Valley PrimeInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
7.12 miles Edge CampusInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
7.14 miles Edge ValleyInterested in this information?Contact us
7.16 miles TwoInterested in this information?Contact us
7.28 miles Keppel Dublin 2
Built in 2013, Keppel acquired the Ballycoolin site – previously owned by Dataplex – in 2017.
7.33 miles K2: DUB 4
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
7.33 miles Servecentric Blanchardstown
7.34 miles Prime CenterInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.37 miles K2: DUB 5
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
7.38 miles Equinix: Ballycoolin
The Ballycoolin data center is a 40,000 sq ft (3,716 sqm) facility on Dublin's north side. It has 7,000 sq ft (650 sqm) of fully allocated data halls.
7.40 miles K2 Dublin 1
7.42 miles ThreeInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.47 miles Plaza TwoInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.48 miles Blanchardstown Dublin - Digital Realty
Digital Realty’s Blanchardstown Data Centre is a Tier Ill designed building, the two-story building is 120,000sqft. The facility also hosts Servecentric Blanchardstown in the building.
7.49 miles West CampusInterested in this information?Contact us
7.50 miles East ParkInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.57 miles Hub ThreeInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.60 miles North ParkInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.62 miles Plaza BetaInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.64 miles Pure DC: DUB 01
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
7.65 miles EngineNode: Meath DC4
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
7.68 miles EngineNode: Meath DC3
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
7.68 miles Pure DC: DUB 02
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
7.72 miles EngineNode: Meath DC2
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
7.72 miles Pure DC: DUB 03
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
7.73 miles EngineNode Meath
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
7.88 miles Equinix Dublin DB4
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
7.94 miles Equinix Dublin DB3
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
8.56 miles Energia: Huntstown, Dublin
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
8.60 miles Energia: Huntstown 2
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
11.23 miles Core PointInterested in this information?Contact us
11.30 miles Hyperscale Data CenterInterested in this information?Contact us
11.31 miles Cloud CampusInterested in this information?Contact us
11.32 miles UltraInterested in this information?Contact us
11.34 miles PlusInterested in this information?Contact us
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
11.35 miles Digital Realty: Clonshaugh
Located within easy access of Dublin Airport, via city’s many transport links, Digital Realty’s Clonshaugh data centers (DUB11 and DUB12) provide 10,219m2(110,000f 2) of highly-connected premium customer space.
11.35 miles Point PrimeInterested in this information?Contact us
11.35 miles ParkInterested in this information?Contact us
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
11.39 miles Hyperscale Data CenterInterested in this information?Contact us
11.40 miles Plaza PrimeInterested in this information?Contact us
11.43 miles Hyperscale Data CenterInterested in this information?Contact us
11.47 miles GTT Dublin International Exchange Center
11.51 miles Vodafone Dublin
11.55 miles Verizon Dublin
11.55 miles EdgeInterested in this information?Contact us
11.62 miles StationInterested in this information?Contact us
12.19 miles StationInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.24 miles Edge PointInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.30 miles WestInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.34 miles Prime ValleyInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.35 miles West PlazaInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.44 miles Edge CampusInterested in this information?Contact us
Microsoft is expanding its Irish data center footprint with a new campus in County Kildare, southwest of Dublin.

CyrusOne Dublin I Data Center Photos See all

CyrusOne Dublin 1 Campus
Source: cy
CyrusOne Dublin 1 Campus
Source: CyrusOne
CyrusOne Dublin 1 Campus
Source: CyrusOne

Operating Company

Operated by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.
118
Facilities
31
Markets

News See all

Read CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas
CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone Co...

CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas

August 01, 2026 CyrusOne

CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone County, about 90 miles (144.8km) south of Dallas, is part of a 760MW data center development being...

Read more
Read CyrusOne Begins Construction on 380MW Data Center in Texas
CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development...

CyrusOne Begins Construction on 380MW Data Center in Texas

June 08, 2026 CyrusOne

CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development have not yet been disclosed. CyrusOne has partnered with Constellation on a 380MW agreement to...

Read more
Read CyrusOne to Internalize US Data Center Operations
CyrusOne to Internalize US Data Center Operations

CyrusOne to Internalize US Data Center Operations

May 07, 2026 CyrusOne

US data center operator CyrusOne is bringing a significant portion of its on-site operations in-house, ending large sections of its existing outsourcing partnership with JLL. The KKR-owned company confirmed to DCD this week that it is restructuring its US operating model by internalizing on-site...

Read more
Read CyrusOne Wins Approval for Sangamon, Illinois Data Center
CyrusOne Wins Approval for Sangamon, Illinois Data Center

CyrusOne Wins Approval for Sangamon, Illinois Data Center

April 09, 2026 CyrusOne

CyrusOne has received approval to build a data center in Sangamon, Illinois. Members of the Sangamon County Board voted on Tuesday to allow construction of the $500 million project, which will span 280 acres and include four buildings at the 13000 block of Thayer Road in Waverly.CyrusOne has said...

Read more
Read CyrusOne Starts Construction on First Italy Data CenterI Outside Milan
CyrusOne Starts Construction on First Italy Data CenterI Outside Milan

CyrusOne Starts Construction on First Italy Data CenterI Outside Milan

March 28, 2026 CyrusOne

CyrusOne has broken ground on its first data center in Italy. The company this week announced it has officially broken ground on MIL1 in Milan. The three-story facility will deliver 27MW of IT capacity across 7,000 sqm (75,345 sq ft) of technical space, with the first phase expected to go live by...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?