Data Center Campus

CyrusOne: Grange Castle DUB1 Campus

CyrusOne's DUB1 campus covers about 24 acres in Grange Castle Business Park South, Baldonnel, west Dublin, on council land held on a 999-year lease, with its own 110 kV substation. First built in 2021, with a second building permitted since 2019.

3 sites Dublin
OperationalPlannedProspective Expansion
Fully operational facility with future phases planned and prospective expansion planned
Developed by:

Campus at a Glance

3 data centers on this campus
First built in 2021 with expansions through 2028
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 53.3161, -6.4551
░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

CyrusOne's DUB1 campus sits in Grange Castle Business Park South, off the Baldonnel Road in Baldonnel, Dublin 22. The 9.7 ha (24 acre) site joins 6.3 ha of business-park land owned by South Dublin County Council with the former house plots of Erganagh, Kent Cottage, Weston House and Weston Lodge. CyrusOne holds the park land on a 999-year ground lease signed in 2019. Google's Grange Castle data centre adjoins the site to the east, and Amazon's buildings sit across the access road to the north.

Planning. South Dublin County Council granted SD18A/0134 in September 2018 for a two-storey data centre in two adjoined blocks (four data halls), a three-storey office block and 32 standby diesel generators, 35,426 m² in total. An Bord Pleanála upheld the grant on appeal in April 2019 (ABP-302813-18). The council refused a first extension of duration in September 2023 and granted a second (SD18A/0134/EP2) in November 2023. CyrusOne markets the campus as three two-storey buildings.

Power. A dedicated Aungierstown 110 kV gas-insulated substation with two 80 MVA transformers serves the campus. Two short underground 110 kV circuits link it to EirGrid's Castlebaggot 220/110 kV station next door; An Bord Pleanála approved it as strategic infrastructure (ABP-309146-21). A temporary ESB substation (SD19A/0300) served the first build. Cooling uses N+1 free-cooling air-cooled chillers on a chilled-water ring, and the first building carries 40 kWp of rooftop solar.

Ownership. CyrusOne Irish Datacentres Holdings Ltd. develops and operates the campus. KKR and Global Infrastructure Partners took CyrusOne private in March 2022. Structure Tone (STO Building Group) built the first building and the Aungierstown substation; construction began in September 2019.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
CyrusOne: DUB1 Bldg 1 CyrusOne
OperationalPlanned
░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2021
CyrusOne: DUB1 Bldg 2 CyrusOne
Planned
— — 2028
CyrusOne: DUB1 Bldg 3 CyrusOne
Prospective Expansion
— — —

Map and Nearby Locations

CyrusOne: Grange Castle DUB1 Campus Power Growth Over Time

+17% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.