Servecentric Blanchardstown

Decommissioned
Facility permanently shut down and decommissioned
Operated by: Servecentric Ltd

Servecentric Blanchardstown

Lot Size: 2 acres
This site is leased from Digital Realty Trust in the Blanchardstown Dublin - Digital Realty building

Servecentric, an Irish managed service provider, has appealed the rejection of its Dublin data center development application. The company's proposal involves converting an undeveloped 1.9-acre site, currently zoned for warehouse/logistics use, into a two-story data center with an accompanying substation.

The planned facility would feature two data halls and, while shorter in height than the previously approved warehouse design, would expand the gross floor area by approximately 2,931 square meters to reach 6,524 square meters (70,225 square feet).

Map and Nearby Locations

Unit 9
Servecentric Ltd Sites
Nearby Facilities

Sites within 15 miles of Servecentric Blanchardstown

Distance Site About
0.11 miles Equinix: Ballycoolin
The Ballycoolin data center is a 40,000 sq ft (3,716 sqm) facility on Dublin's north side. It has 7,000 sq ft (650 sqm) of fully allocated data halls.
0.18 miles Blanchardstown Dublin - Digital Realty
Digital Realty’s Blanchardstown Data Centre is a Tier Ill designed building, the two-story building is 120,000sqft. The facility also hosts Servecentric Blanchardstown in the building.
0.20 miles PointInterested in this information?Contact us
0.28 miles K2: DUB 5
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
0.29 miles Equinix: DB5x
Equinix's fifth data center in Ireland opened in Q4 2022, located in the former Clyde House in Blanchardstown.
0.29 miles Equinix: DB7x
Equinix has begun construction of its DB7x data center at its Blanchardstown campus in Profile Park, Grange Castle Business Park, Clondalkin, Dublin, Ireland, with the facility expected to deliver initial capacity by early 2028. Based on cost benchmarks, the project is estimated to provide 9MW of IT load, serving as a retail IBX expansion leveraging existing campus infrastructure.
0.30 miles Equinix: DB6x
DB6x is part of a three-building campus(DB5x, DB6x, DB7x) proposed in a 2020 planning application.
0.35 miles K2: DUB 4
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
0.37 miles South PlazaInterested in this information?Contact us
0.43 miles PrimeInterested in this information?Contact us
0.51 miles CampusInterested in this information?Contact us
0.52 miles K2 Dublin 1
0.53 miles Point MaxInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
0.54 miles AlphaInterested in this information?Contact us
0.56 miles Keppel Dublin 2
Built in 2013, Keppel acquired the Ballycoolin site – previously owned by Dataplex – in 2017.
0.58 miles Metro TowerInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
0.63 miles GlobalInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
0.64 miles Valley UltraInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
0.65 miles Point MaxInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
0.67 miles West StationInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
0.68 miles Prime RidgeInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
0.78 miles Equinix Dublin DB4
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
0.80 miles Pure DC: DUB 01
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
0.87 miles Pure DC: DUB 02
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
0.91 miles Pure DC: DUB 03
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
0.97 miles Equinix Dublin DB3
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
1.26 miles Kyndryl: Dublin
2.01 miles Energia: Huntstown, Dublin
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
2.09 miles Energia: Huntstown 2
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
2.61 miles Campus AlphaInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
2.65 miles Core CenterInterested in this information?Contact us
Facebook broke ground on the Clonee data centre in 2016 and the first building became operational in December 2017. The centre is built on a 250-acre site that was formerly two farms adjoining the headquarters of the Kepak meat business.
2.85 miles South TowerInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
3.18 miles ValleyInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
3.27 miles Core StationInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
3.33 miles EngineNode: Meath DC4
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
3.42 miles EngineNode: Meath DC3
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
3.55 miles EngineNode: Meath DC2
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
3.80 miles EngineNode Meath
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
5.20 miles Digital Realty: Dublin 1
5.42 miles Echelon Clondalkin
Echelon’s DUB10 campus will provide 90MW+ of IT load and includes a grid substation as well as on-site power generation.
5.47 miles Digital Realty: Dublin 2
5.48 miles Echelon: DUB11
Echelon's DUB11 marks the second building of its Clondalkin campus, following the energization of the first building in Q4 2023.
5.54 miles Echelon: DUB12
Echelon's DUB12 marks the third building of its Clondalkin campus.
5.56 miles Echelon: DUB13
Echelon Data Centres has challenged a South Dublin County Council (SDCC) ruling to block the expansion of its DUB10 data center campus in Clondalkin, Dublin, Ireland.
5.86 miles PlusInterested in this information?Contact us
5.91 miles Edge PlazaInterested in this information?Contact us
5.92 miles South StationInterested in this information?Contact us
5.97 miles Plaza UltraInterested in this information?Contact us
6.06 miles PointInterested in this information?Contact us
6.08 miles Vodafone Dublin
6.16 miles ProInterested in this information?Contact us
6.18 miles Verizon Dublin
6.18 miles Hyperscale Data CenterInterested in this information?Contact us
6.20 miles Hyperscale Data CenterInterested in this information?Contact us
6.21 miles Hyperscale Data CenterInterested in this information?Contact us
6.22 miles Echelon: DUB 40
Echelon Data Centres’ DUB40 is planned to be located outside of Dublin, in a data center cluster known as Grange Castle.
6.25 miles Digital Realty: Clonshaugh
Located within easy access of Dublin Airport, via city’s many transport links, Digital Realty’s Clonshaugh data centers (DUB11 and DUB12) provide 10,219m2(110,000f 2) of highly-connected premium customer space.
6.29 miles Digital Realty: DUB3
Located in the Grange Castle data centre cluster, the DUB3 data center offers 59,202 sqft of space and power densities of up to 2kW per square meter, with 4.6MW available for the entire data center.
6.29 miles CyrusOne Dublin Grange Castle
Approved in October 2018, CyrusOne is building a three building campus with 74 MW of power.
6.29 miles Global ValleyInterested in this information?Contact us
6.31 miles North PointInterested in this information?Contact us
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
6.33 miles Digital Realty: DUB4
Digital Realty's DUB4 data center is situated in Grand Castle Park, Dublin, next to its DUB3 facility.
6.33 miles ThreeInterested in this information?Contact us
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
6.40 miles GTT Dublin International Exchange Center
6.51 miles Edgeconnex: DUB03
6.57 miles Edgeconnex: DUB02
6.61 miles Ridge OneInterested in this information?Contact us
Commissioned in 2009, the site was Microsoft's first data center outside of the United States.
6.63 miles Edgeconnex Dublin
EdgeConnex initially built a 4,500sqm data centre (DUB01) in 2016 and later extended that facility further before adding a new 1,500sqm data hall in 2017.
6.67 miles Metro TowerInterested in this information?Contact us
6.68 miles South PointInterested in this information?Contact us
6.76 miles EdgeConnex DUB05
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
6.77 miles Plaza TwoInterested in this information?Contact us
6.78 miles PrimeInterested in this information?Contact us
6.79 miles CampusInterested in this information?Contact us
6.83 miles EdgeConnex DUB04
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
6.84 miles BetaInterested in this information?Contact us
6.91 miles Valley OneInterested in this information?Contact us
6.91 miles Equinix Dublin DB2
Located in Grange Castle business park, DB2 is a former Telecity site that was acquired by Equinix in January 2016.
6.92 miles PrimeInterested in this information?Contact us
The two new facilities, DUB14 & DUB15, are located west of the company's DUB9, DUB10, DUB12, and DUB13 data centers on the Microsoft Dublin Grange Castle campus.
6.97 miles Equinix: DB8
Equinix was planning to construct a facility at Profile Park, Nangor Road, Clondalkin in Dublin. The site was originally planned to be powered by the electric grid, but after failing to secure a permanent supply, Equinix adjusted the proposal to use gas power.
6.98 miles Ridge ThreeInterested in this information?Contact us
6.99 miles Global CampusInterested in this information?Contact us
The two new facilities, DUB14 & DUB15, are located west of the company's DUB9, DUB10, DUB12, and DUB13 data centers on the Microsoft Dublin Grange Castle campus.
7.02 miles Vantage: DUB 13
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
7.07 miles Vantage: Dublin DUB1
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
7.13 miles Vantage: DUB 12
This facility is part of Vantage's DUB1 Campus in Dublin, Ireland.
7.13 miles ValleyInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
7.14 miles East PlazaInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
7.21 miles BetaInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
7.25 miles Digital Profile Park Dublin
Digital Realty owns the 10 acre site at Profile Park and will have access to both power and fiber. The company has secured planning approval to construct 193,384 gross sq ft in two phases and over four buildings.
7.28 miles Digital Realty: DUB14
Digital Realty opened its second data center on the Profile Park campus in Dublin, Ireland in 2019.
7.32 miles CyrusOne : DUB I Bldg 2
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
7.32 miles Digital Realty: DUB15
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
7.33 miles CyrusOne Dublin I
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
7.35 miles West PointInterested in this information?Contact us
Google's second data center in Dublin is located at Google's Profile Park data center campus in Grange Castle.
7.35 miles Hub MaxInterested in this information?Contact us
Google opened its first Irish data center in Dublin at Profile Park, Grange Castle in 2012.
7.36 miles Digital Realty: DUB16
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
7.40 miles CyrusOne : DUB I Bldg 3
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
7.46 miles PointInterested in this information?Contact us
In June 2024, Google submitted a planning application to build a 72,400 sqm (779,310 sq ft) data center on a 50-acre site adjacent to its existing two facilities at Grange Castle Business Park in South Dublin.
7.85 miles ProInterested in this information?Contact us
The Amazon AWS site is a former Tesco storage facility at Greenhills Industrial Estate in Dublin 24.
7.90 miles MetroInterested in this information?Contact us
7.94 miles CampusInterested in this information?Contact us
7.96 miles Prime ValleyInterested in this information?Contact us
8.03 miles Metro PointInterested in this information?Contact us
8.08 miles Equinix: Citywest Dublin
The BT data centre is adjacent to Equinix's DB1 site.
8.08 miles Equinix Dublin DB1
8.21 miles K2: DUB 6
K2 Data Centers completed the purchase of a 4.6-acre site in Citywest Business Park, Dublin, in July 2020 for approximately €3 million.
8.45 miles Global CenterInterested in this information?Contact us
8.45 miles Keppel DC Dublin1
18.97 miles MaxInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
19.00 miles TowerInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
19.09 miles Ridge BetaInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
19.10 miles Core ValleyInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
19.12 miles PlazaInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
19.19 miles Plaza OneInterested in this information?Contact us
Microsoft is expanding its Irish data center footprint with a new campus in County Kildare, southwest of Dublin.

Servecentric Blanchardstown Data Center Photos See all

Operating Company

Operated by: Servecentric Ltd

Founded in 2002, Servecentric is a provider of Data Centre services including colocation, connectivity services, hosting and managed IT services.

1
Facilities
1
Markets

News See all

Read ABB Buys Premium Power to Strengthen Data Center Advisory Services
ABB Buys Premium Power to Strengthen Data Center Advisory Services

ABB Buys Premium Power to Strengthen Data Center Advisory Services

February 16, 2026 Dublin

Global electrification firm ABB has acquired Irish electrical engineering consultancy Premium Power to expand its advisory capabilities within the data center market.“For more than two decades, Premium Power has built its reputation by helping customers solve complex electrical challenges with...

Read more
Read RackNerd expands offerings to Dublin, Ireland
RackNerd expands offerings to Dublin, Ireland

RackNerd expands offerings to Dublin, Ireland

November 21, 2024 Dublin

Infrastructure-as-a-Service (IaaS) provider RackNerd has expanded its offering to Dublin, Ireland and will be offering its IaaS from the Digital Realty DU10 data center located in Dublin, Ireland."Our expansion into Dublin represents a strategic response to the growing demand for high-performance...

Read more
Read Servecentric files appeal after data center planning denial
Servecentric files appeal after data center planning denial

Servecentric files appeal after data center planning denial

January 06, 2024 Servecentric Ltd

Irish managed service provider Servecentric has lodged an appeal to the Fingal County Council after its application to develop a new data center in Dublin was denied. This comes after the service provider’s proposal to develop a data center on land in the Blanchardstown Corporate Park in...

Read more
Read Data center proposal for SDC Piperstown in Dublin, Ireland, pulled
Data center proposal for SDC Piperstown in Dublin, Ireland, pulled

Data center proposal for SDC Piperstown in Dublin, Ireland, pulled

April 30, 2023 Dublin

The Dublin, Ireland, two-story data center developing application has been retracted. SDC Piperstown II Ltd submitted a request to Fingal County Council on January 17, 2023, for permission to build a data center on a 20-acre site in Piperstown, Dublin. But this has since been dropped, for no...

Read more
Read More applications for data centers in the greater Dublin area as grid capacity concerns continue
More applications for data centers in the greater Dublin area as grid capacity concerns continue

More applications for data centers in the greater Dublin area as grid capacity concerns continue

January 01, 2023 Dublin

According to reports, in the wake of the Dublin data center moratorium over grid issues, 21 new data centers are planned outside of the greater Dublin area. Sixteen of these facilities are large-scale data centers, while a further five smaller-scale data center projects are being discussed with...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?