Crusoe: Goodnight 6

Latest Podcast 10001 Lima Rd
Under Construction
New facility under construction
Operated by:

Crusoe: Goodnight 6

Short Code: Building 6
Year Planned: 2028
Utility Provider: Greenbelt Electric Cooperative (ERCOT); Oncor transmission

Sites leasing space from Crusoe:

Goodnight 6 is building 6 of 6 on Crusoe's Goodnight campus (Project Llano) in the Texas Panhandle. It is the last of four larger buildings on the campus.

Goodnight 5 and 6 will take their power from a planned on-site natural-gas plant rather than the grid. Crusoe applied for the plant's air permit in January 2026, and the permit was still under review when Texas paused data center permits.

Site History

  • September 2026: Texas paused state permits for data center projects, including the gas plant's air permit.
  • May 2026: Construction of the building began.
  • January 2026: Crusoe applied for an air permit for the on-site gas plant that will power buildings 5 and 6.

Map and Nearby Locations

10001 Lima Rd
Crusoe Sites
Nearby Facilities

Crusoe: Goodnight 6 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Crusoe: Goodnight 6

Distance Site
0.00 miles Station TwoInterested in this information?Contact us
0.21 miles Crusoe: Goodnight 5
0.21 miles Campus AlphaInterested in this information?Contact us
0.49 miles Crusoe: Goodnight 2
0.49 miles CenterInterested in this information?Contact us
0.52 miles Metro ValleyInterested in this information?Contact us
0.52 miles Crusoe: Goodnight 1
0.55 miles Crusoe: Goodnight 3
0.55 miles Central CampusInterested in this information?Contact us
0.92 miles North RidgeInterested in this information?Contact us
0.92 miles Crusoe: Goodnight 4

Crusoe: Goodnight 6 Data Center Photos See all

Crusoe’s DFM system converts natural gas into electricity that powers wellsite digital operations
Source: Source: Crusoe Energy Systems

Operating Company

Operated by:

Crusoe is a privately held AI infrastructure developer and GPU cloud provider that builds AI data center campuses and offers GPU cloud services in the United States. The company began as Crusoe Energy Systems, a flare mitigation provider that powered onsite computing from stranded natural gas, with bitcoin mining as an early use case.

Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings.

For this project, it is reported that Crusoe’s direct customer is Oracle and that OpenAI is Oracle’s customer; the Abilene campus is tied to OpenAI’s Stargate program;

OpenAI later announced an additional 4.5 GW Stargate partnership with Oracle that references the Abilene Stargate I site. Crusoe also expanded in-house manufacturing capability through the acquisition of Easter-Owens Electric in 2022.

Crusoe History:

  • In July 2025 announced a 1.8 GW AI data center campus with Tallgrass near Cheyenne, Wyoming.
  • In May, 2025, secured $11.6 billion in debt and equity to expand the Abilene, Texas campus to eight buildings, with Crusoe noting Oracle as the direct customer and OpenAI as Oracle’s customer for the site.
  • In March 2025 began construction on the second phase of the Abilene, Texas campus to bring total planned capacity to 1.2 GW.
  • In April 2022 raised Series C financing that included plans to launch the CrusoeCloud platform for high performance computing.
  • In June 2022 acquired Easter-Owens Electric to vertically integrate modular data center manufacturing.
  • Founded in 2018 as Crusoe Energy Systems to mitigate gas flaring by powering onsite computing, including bitcoin mining.
0
Facilities
0
Markets

News See all

Read Crusoe Files For $4.8B Data Center Campus In Jayton, Texas
Crusoe has filed plans with the [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/tabs/search) for a two-building data center campus in Jayton, in rural Kent County, Texas, ...

Crusoe Files For $4.8B Data Center Campus In Jayton, Texas

November 27, 2026 Crusoe

Crusoe has filed plans with the Texas Department of Licensing and Regulation for a two-building data center campus in Jayton, in rural Kent County, Texas, carrying an estimated investment of $4.8 billion. The filings, first reported by Data Center Dynamics, place the site along County Road 233...

Read more
Read Fermi Secures 600MW Hyperscaler Deal, Terminates TensorWave Lease
[Fermi America](https://baxtel.com/data-centers/fermi-america) has agreements with an undisclosed investment-grade hyperscaler to advance 600MW of power capacity at its Project Matador campus in th...

Fermi Secures 600MW Hyperscaler Deal, Terminates TensorWave Lease

November 13, 2026 Fermi America

Fermi America has agreements with an undisclosed investment-grade hyperscaler to advance 600MW of power capacity at its Project Matador campus in the Texas Panhandle. The customer will prepay $200 million and commit $15 million to early construction, according to the company's Nov. 12...

Read more
Read Mubbadrah Consortium Plans $3B, 400MW AI Campus in Oman; Crusoe Eyes Offtake
A consortium led by Omani investment group Mubbadrah Investment plans an AI data center campus of up to 400 MW in Salalah, [Oman](https://baxtel.com/regions/oman), backed by $3 billion of initial i...

Mubbadrah Consortium Plans $3B, 400MW AI Campus in Oman; Crusoe Eyes Offtake

November 11, 2026 Oman

A consortium led by Omani investment group Mubbadrah Investment plans an AI data center campus of up to 400 MW in Salalah, Oman, backed by $3 billion of initial investment, DCD reported Wednesday. US AI infrastructure firm Crusoe has indicated interest in becoming an off-taker. The facility would...

Read more
Read Crusoe Signs 106MW Paraguay AI Cloud Partnership With Araico
[Crusoe](https://baxtel.com/data-centers/crusoe) signed a [strategic partnership](https://markets.businessinsider.com/news/stocks/crusoe-partners-with-araico-to-deploy-ai-cloud-infrastructure-in-pa...

Crusoe Signs 106MW Paraguay AI Cloud Partnership With Araico

October 23, 2026 Crusoe

Crusoe signed a strategic partnership with Araico, a Paraguayan energy and infrastructure developer, to build AI compute infrastructure powered by the Itaipú Hydroelectric Dam. The first deployment is planned for mid-2027, with a path to 106 MW of IT capacity. Under the partnership, Araico leads...

Read more
Read Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus
[Crusoe](https://baxtel.com/data-centers/crusoe) will take a second, larger building at [Polar Data Centers](https://baxtel.com/data-centers/polar-dc)' Tørdal campus in Norway. Polar announced the ...

Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus

October 22, 2026 Crusoe

Crusoe will take a second, larger building at Polar Data Centers' Tørdal campus in Norway. Polar announced the expansion on Oct. 21 (announcement). The new building, DRA02, will add 40MW of liquid-cooled critical IT capacity on hydroelectric power and is due online in late 2027. Crusoe plans...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.