Latest Podcast 9701 S John Young Pkwy
Operational
Fully operational facility
Operated by:

CoreSite Orlando OR1

Short Code: OR1
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Power:

  • Two Diverse Underground Utility Feeds
  • N+1 or 2N UPS Power
  • A & B Power in Every Rack
  • Massive 13.4 Megawatt Generator Plant
  • 40,000 Gallons of Reserve Fuel
  • 72-Hour Generator Run Time

HVAC:

  • 2,750 tons of chiller capacity
  • Massive 2,510 Ton Chiller Plant
  • Around the Clock Heat Rejection
  • N+1 Redundancy
  • The Perfect Temperature Every Minute of Every Day
  • Up 600 watts/sf Power Density
  • Support for Water Cooled Equipment

Map and Nearby Locations

9701 S John Young Pkwy
CoreSite Sites
Nearby Facilities

Sites within 15 miles of CoreSite Orlando OR1

Distance Site About
2.54 miles Lumen Orlando 3
7.22 miles Lumen Orlando 2
7.80 miles Colo Solutions Orlando
13.15 miles HostDime Eatonville
The new category 5 hurricane-rated facility will feature space for over 1,000 racks.
13.17 miles Lumen Orlando 1
13.30 miles HostDime Orlando
HostDime’s privately owned and operated enterprise data center is located in Central Florida.

CoreSite Orlando OR1 Data Center Photos See all

Operating Company

Operated by:

CoreSite Realty is a data center REIT with a focus on network dense buildings. The company operates the Any2 Peering Exchange, which is the largest Internet Exchange in the Western US.

CoreSite History

CoreSite Realty Corporation was founded in 2001 as CRG West, a portfolio company of The Carlyle Group. CRG West initially started with two data center buildings; One Wilshire in Los Angeles and 55 South Market in San Jose. The buildings were popular network interconnection and peering points. Although 55 S Market has declined as an interconnection point, One Wilshire continues to be a popular building for network interconnection.

2007: Sold the Company's Jewel to Fuel Expansion

In August, the company sold the One Wilshire Building to Hines REIT for $287 million. The large transaction gave CRG West additional capital to fund the company's growth into new markets.

In May, CRG West acquires buildings in Chicago (for $34 million) and Sommerville just outside of Boston. The Chicago building at 427 S LaSalle was originally designed and built by Western Union. Western Union buildings have traditionally been converted into Carrier Hotels because the telegraph infrastructure with their risers of conduits works well for the telecom industry. The facility is situated across from One Financial Plaza and adjacent to the Chicago Board of Trade.

CoreSite Boston at 70 Innerbelt Road, Somerville, MA is located less than two miles from downtown Boston and Cambridge. The large building has SunGard and Internap as significant tenants also offering colocation

2008: Added Reston

CRG West acquired their Reston facility at 12100 Sunrise Valley.

2009: Rebranded

CRG West rebranded as CoreSite.

2010: IPO added More Capital to Expand

In September, CoreSite became publicly traded on the New York Stock Exchange (NYSE: COR). The Carlyle Group still owned ~50% of the newly public company at the time of the IPO. The Carlyle Group has since reduced their ownership to less than 30%.

2012 Added Denver

In April, CoreSite acquired Comfluent and their two Denver data centers. The data centers were small, but pivotal to the Denver Interconnection and Peering Market. DE1 is located in 910 15th Street, Denver's Telecom Hotel, the Denver Gas & Electric Building (DGEB.) Comfluent was the defacto meet me room for the building. DE2 was 639 E 18th Ave, which was adjacent to Level 3's Denver Gateway site.

CoreSite was headquarted in Denver, but until 2012 did not have any data centers in Colorado.

2013

SV5 was built and leased to a single tenant

2014: New Buildings

  • VA2 launched with an initial build of 50,000 of 198,000 sqft
  • NY2 launched with an initial build of 65,000 of 283,000 sqft

2016: Change at the Top

Tom Ray, CoreSite's CEO since inception retired. Paul Szurek became CoreSites new CEO.

In August, Sunrise Technology Park (STP) was acquired for $60 million with a plan to significantly expand the campus.

Reston Campus Expansions

12100 Sunrise Valley was first acquired in 2008 and CoreSite has since turned the Reston site into a campus. The company constructed a building (VA2) in the parking lot. In 2018, Coresite acquired a 22-acre lot a few blocks away at 12379 Sunrise Valley Drive. The lot will serve to virtually expand the Reston Campus.

The development has four phases and involves building new 3-story data centers and demolishing the old buildings. CoreSite has begun work on VA3 on the new lot.

35
Facilities
12
Markets
297MW
Megawatts

News See all

Read CoreSite Tops Out Denver data center
CoreSite Tops Out Denver data center

CoreSite Tops Out Denver data center

October 09, 2025 CoreSite

US data center firm CoreSite has topped out its latest facility in Denver, Colorado. Ground was broken on the 180,000 sq ft (16,720 sqm) building earlier this year and it set to launch next year. The company said it was the first purpose-built data center in Denver in more than 20 years. “At...

Read more
Read CoreSite Launches Third New York Data Center
CoreSite Launches Third New York Data Center

CoreSite Launches Third New York Data Center

September 27, 2025 CoreSite

US data center firm CoreSite this week announced the completion of its newest facility, NY3 in Secaucus, New Jersey. The purpose-built data center, located adjacent to CoreSite’s existing NY2 facility at 2 Emerson Lane, adds more than 138,000 sq ft (12,820 sqm) to CoreSite’s greater New York...

Read more
Read CoreSite plans new facilities in Secaucus and Denver
CoreSite plans new facilities in Secaucus and Denver

CoreSite plans new facilities in Secaucus and Denver

December 15, 2023 CoreSite

American Tower subsidiary CoreSite revealed its plans to expand its data center footprints in New Jersey and Colorado. The company revealed that it is already making plans for a data center in New Jersey which will be located adjacent to its NY2 facility at 2 Emerson Lane in Secaucus. It has also...

Read more
Read Stonepeak Announces $570m Investment in CoreSite
Stonepeak Announces $570m Investment in CoreSite

Stonepeak Announces $570m Investment in CoreSite

October 31, 2022 CoreSite

Investment company Stonepeak has increased its investment in CoreSite by $570m. The data center company was acquired in 2021 by American Tower Corporation for $10 billion. After the acquisition, Stonepeak invested $2.5 billion in the data center company in the summer. Stonepeak’s new investment...

Read more
Read CoreSite Acquires Hurricane Resistant Data Center in Miami, Florida
CoreSite Acquires Hurricane Resistant Data Center in Miami, Florida

CoreSite Acquires Hurricane Resistant Data Center in Miami, Florida

October 05, 2022 CoreSite

CoreSite has announced the acquisition of a data center in Miami, Florida. The data center acquired is a purpose-built 9,550 square meter (103,000 square feet) facility located at 2100 NW 84th Avenue. The company didn’t reveal the terms of the transaction. CoreSite is naming the new data center...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?