CalEthos: Lithium Valley 1

Latest Podcast W Sinclair Road & Hwy 111
Withdrawn
Project cancelled before construction
Operated by:

CalEthos: Lithium Valley 1

Year Planned: 2027
Utility Provider: Imperial Irrigation District
Lot Size: 315 acres

Sites on this Campus:

CalEthos planned this first phase of about 200,000 sq ft on a 315-acre optioned parcel at West Sinclair Road and Highway 111 near Calipatria. It let the option lapse in July 2025 and dropped the project.

Map and Nearby Locations

W Sinclair Road & Hwy 111
TerraVolt Holdings Sites
Nearby Facilities

CalEthos: Lithium Valley 1 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CalEthos: Lithium Valley 1

Distance Site About
0.57 miles CalEthos: Lithium Valley Expansion

Operating Company

Operated by:

TerraVolt Holdings, Inc. develops land and power for data centers. It assembles undeveloped land with access to energy and fiber, then plans to deliver construction-ready building sites with onsite behind-the-meter power to hyperscale, neocloud and colocation companies. TerraVolt calls this model Physical Infrastructure-as-a-Service.

  • Current project: A master-planned, onsite-powered data center campus in Southeast Idaho on the Northwest Natural Gas Pipeline. In May 2026 TerraVolt signed a firm supply agreement for 55,000 MMBtu per day of natural gas for the campus power plant.
  • Former Lithium Valley project: As CalEthos, the company planned a geothermal- and solar-powered campus near Calipatria, California. It let the land option lapse in July 2025 and dropped the project.
  • Corporate: CalEthos, Inc. renamed itself TerraVolt Holdings, Inc. in July 2026. The company trades on the OTCQB as GEDC and is based in Tustin, California. Joel D. Stone is CEO.
0
Facilities
0
Markets

News See all

Read TerraVolt Secures Option On 1,077 Acres In Idaho For 240MW Campus
[TerraVolt Holdings](https://baxtel.com/data-centers/terravolt-holdings) has secured options to buy about 1,077 acres in Cassia County, Idaho, for a 240 MW gas-powered data center campus. The devel...

TerraVolt Secures Option On 1,077 Acres In Idaho For 240MW Campus

November 04, 2026 TerraVolt Holdings

TerraVolt Holdings has secured options to buy about 1,077 acres in Cassia County, Idaho, for a 240 MW gas-powered data center campus. The developer announced the agreements in a press release on Oct. 30 and set out the terms in a Form 8-K filed the same day. Wickel Land Company LLP granted the...

Read more
Read California Resources and Bloom Energy Sign MOU For 1GW of California Fuel Cells
California Resources and Bloom Energy signed a [memorandum of understanding](https://www.globenewswire.com/news-release/2026/11/02/3393776/0/en/california-resources-corporation-announces-strategic-...

California Resources and Bloom Energy Sign MOU For 1GW of California Fuel Cells

November 03, 2026 California

California Resources and Bloom Energy signed a memorandum of understanding to jointly evaluate 1GW or more of solid-oxide fuel cell generation in California. The non-binding agreement names data centers, utilities, community choice aggregators, municipalities, and other industrial users as...

Read more
Read PG&E Data Center Pipeline Reaches 12.87GW, Defers Load Beyond 1.8GW
PG&E's data center pipeline reached 12,870 MW in September, up from 12,710 MW at the end of June. The utility furnished the figures with its [third-quarter 2026 earnings materials](https://investor...

PG&E Data Center Pipeline Reaches 12.87GW, Defers Load Beyond 1.8GW

October 28, 2026 California

PG&E's data center pipeline reached 12,870 MW in September, up from 12,710 MW at the end of June. The utility furnished the figures with its third-quarter 2026 earnings materials on October 22. Large load beyond an initial 1.8 GW sits on a list of work that will be delayed or deferred....

Read more
Read Data Center Firm Set to Acquire Former IBM Research Campus in Silicon Valley
Former IBM research campus in San Jose, California, is being acquired by data center developer Blackstart Digital. According to Mercury News, Blackstart has agreed to acquire the former IBM Almaden...

Data Center Firm Set to Acquire Former IBM Research Campus in Silicon Valley

October 06, 2026 California

Former IBM research campus in San Jose, California, is being acquired by data center developer Blackstart Digital. According to Mercury News, Blackstart has agreed to acquire the former IBM Almaden Research Center at 650 Harry Road, with financial terms undisclosed. The deal could close before...

Read more
Read Former LBNL Supercomputing Site in Oakland Slated for 20MW Data Center
A real estate firm is planning to convert a former supercomputing facility in Oakland, California, into a 20MW data center. First reported by BizJournal, Behring Cos. plans to redevelop 415 20th St...

Former LBNL Supercomputing Site in Oakland Slated for 20MW Data Center

August 12, 2026 California

A real estate firm is planning to convert a former supercomputing facility in Oakland, California, into a 20MW data center. First reported by BizJournal, Behring Cos. plans to redevelop 415 20th Street, a four-story building that once housed the Lawrence Berkeley National Laboratory’s Oakland...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.