Data Center Campus

CalEthos: Lithium Valley Campus

Proposed clean-energy data center campus on a 315-acre optioned parcel at West Sinclair Road and Highway 111 near Calipatria, in Imperial County's Lithium Valley. Announced in 2024; CalEthos dropped it in 2025 when its land option lapsed.

2 sites California
Withdrawn
Project cancelled before construction
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2027 with expansions through 2027
Coordinates: 33.17347, -115.52865
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

CalEthos (renamed TerraVolt Holdings in 2026) proposed a data center campus in Imperial County's Lithium Valley, near Calipatria, California.

  • Site: CalEthos took an option on a 315-acre parcel at West Sinclair Road and Highway 111 in July 2024, at a $5 million purchase price.
  • Plan: Phase 1 covered 100 acres with up to 1 million sq ft, growing to 3 to 4 million sq ft over time.
  • Power: Grid-delivered geothermal and solar power through Imperial Irrigation District.
  • Partners: HDR (design), ZGlobal (energy) and American Dark Fiber (fiber).
  • Status: CalEthos let the option expire unexercised in July 2025, citing Lithium Valley Specific Plan delays, and shifted to states that allow on-site gas generation.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
CalEthos: Lithium Valley 1 TerraVolt Holdings
Withdrawn
— — 2027
CalEthos: Lithium Valley Expansion TerraVolt Holdings
Withdrawn
— — —

Map and Nearby Locations

CalEthos: Lithium Valley Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

TerraVolt Holdings, Inc. develops land and power for data centers. It assembles undeveloped land with access to energy and fiber, then plans to deliver construction-ready building sites with onsite behind-the-meter power to hyperscale, neocloud and colocation companies. TerraVolt calls this model Physical Infrastructure-as-a-Service.

  • Current project: A master-planned, onsite-powered data center campus in Southeast Idaho on the Northwest Natural Gas Pipeline. In May 2026 TerraVolt signed a firm supply agreement for 55,000 MMBtu per day of natural gas for the campus power plant.
  • Former Lithium Valley project: As CalEthos, the company planned a geothermal- and solar-powered campus near Calipatria, California. It let the land option lapse in July 2025 and dropped the project.
  • Corporate: CalEthos, Inc. renamed itself TerraVolt Holdings, Inc. in July 2026. The company trades on the OTCQB as GEDC and is based in Tustin, California. Joel D. Stone is CEO.