Azur: Sophia Antipolis

Latest Podcast
950 Route des Colles
Operational
Fully operational facility
Operated by:

Azur: Sophia Antipolis

░░░ Request Dataset MW
Total Power
░░░░░ Login to view SqFt
Gross Colocation Size

Azur Datacenter's Sophia Antipolis facility is located at 950 Route des Colles, 06410 Biot, France. The facility offers 500 square meters of data floor space and can accommodate 200 racks.

Map and Nearby Locations:

950 Route des Colles
Azur Datacenter Sites
Nearby Facilities

Sites within 15 miles of Azur: Sophia Antipolis

Distance Site About
0.97 miles Cogent Antibes
1.18 miles nLighten: Sophia Antipolis I
This facility was formerly operated by Euclyde Datacenters, which officially rebranded to nLighten France in 2024 following its acquisition by the nLighten group.
1.92 miles nLighten: Sophia Antipolis II
This facility was formerly operated by Euclyde Datacenters, which officially rebranded to nLighten France in 2024 following its acquisition by the nLighten group.
3.75 miles Titan Mougins
3.75 miles Evroc: Mougins
The data center, located in Mougins and named an "AI factory," will be built in phases, ultimately housing 50,000 GPUs to support advanced AI applications.
10.76 miles Cogent Nice
19.31 miles Monaco Telecom: Monaco
The data center will occupy two of the four underground levels, covering 1,550 sqm. Construction is scheduled to be completed by 2027.

Azur: Sophia Antipolis Data Center Photos (See all)

Operating Company

Operated by:

Azur Datacenter is an innovative hosting provider and datacenter manufacturer, specializing in advanced cooling solutions. They offer colocation, hosting, and cutting-edge cooling technologies including Direct Liquid Cooling (DLC) and Immersion Cooling.

The company addresses the growing challenge of cooling high-performance computing equipment. With processor power consumption exceeding 200W and some reaching 400W, traditional air-cooled datacenters struggle to manage heat effectively. GPU units often operate above 300W, and the trend shows no signs of slowing.

Azur Datacenter has already implemented next-generation cooling solutions, such as a Direct Liquid Cooling (DLC) high-performance computing cluster reaching 72kW/rack for a client in March 2021. They anticipate rack power density to double every seven years, with projections of over 70kW per rack by 2022.

The company positions itself at the forefront of datacenter technology, offering "Direct Liquid Cooling ready" and "Immersion Cooling ready" solutions to meet the evolving needs of IT professionals facing cooling challenges in traditional datacenters.

2
Facilities
0
Markets
7MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?