Pulsant: Edinburgh SC-2

Latest Podcast
7 Bankhead Medway Sighthill Industrial Estate
Operational
Fully operational facility
Operated by:

Pulsant: Edinburgh SC-2

Year Built: 2009
░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Pulsant acquired this data centre as part of its purchase of Onyx in 2016.

  • Total Building Size 3,121m²
  • Total Data Hall Space 1,449m²
  • Renewable Energy 100%
  • UPS Redundancy N+1
  • Standby Power Configuration N+1
  • Generator Capacity 58,000L On-Site Stand-By Capacity

Map and Nearby Locations:

7 Bankhead Medway Sighthill Industrial Estate
Pulsant Sites
Nearby Facilities

Sites within 15 miles of Pulsant: Edinburgh SC-2

Distance Site About
0.32 miles Pulsant: Edinburgh South Gyle SC-1
0.62 miles Shelborn: Edinburgh Green Campus
Plans for a massive new data center at Edinburgh Park have been unanimously rejected by the City of Edinburgh Council.
1.39 miles Apatura: Wester Hermiston AI DC
Apatura is moving forward with plans to develop the Wester Hermiston AI Data Centre Campus, a high-performance facility in Edinburgh designed to support hyperscale AI and cloud workloads.
1.52 miles Apatura: Wester 2
This facility is part of Apatura's Wester Hermiston AI Data Centre Campus in Scotland.
1.67 miles Apatura: Wester 3
4.41 miles Pulsant: Edinburgh SC-3
4.59 miles Carrier-Neutral Data Center Request Dataset
Deep Green is building a data center in Edinburgh, UK.
10.42 miles Asanti: Livingston
Located in Scotland’s central belt, the Asanti Livingston Data Centre is a premier Tier III-compliant facility designed for high-density colocation and maximum resilience.
10.48 miles ATOS: Livingston
The facility is owned and operated by Atos Group, but since 2022 (and extended in 2025), a significant portion of its capacity is leased and marketed by Asanti.
12.50 miles ILI Group: Cato Expansion
12.60 miles ILI Group: Cato Campus
Renewable energy firm ILI Group is planning the Cato data center campus in Auchtertool, Fife.
13.20 miles SDCL: Cockenzie Campus
East Lothian Council has selected London-based Sustainable Development Capital LLP (SDCL) as the preferred supplier to develop a hyperscale data centre on the former coal storage site of the decommissioned Cockenzie Power Station.
13.22 miles SDCL: Cockenzie Expansion
15.34 miles RBS Macmerry

Pulsant: Edinburgh SC-2 Data Center Photos (See all)

Operating Company

Operated by:
14
Facilities
2
Markets
21MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?