Apple: 21100 Interstate

Year Planned: 2029
Utility Provider: NV Energy

Apple has acquired 147 acres of land next to its Reno data center campus for future developments.

Utility & Power

Served by NV Energy (Sierra Pacific Power Co.), the Northern Nevada investor-owned utility. Nevada is not in an RTO, so large-load requests route bilaterally through NV Energy and the PUCN rather than through an interconnection queue.

This parcel is undeveloped land bank within Reno Technology Park, adjacent to Apple's operating data center campus. Estimated developable capacity ~150 MW (~1 MW/acre); no capacity is contracted yet.

Campus power context:

  • Apple's ~$1.3B Reno Technology Park expansion (approved by NV GOED, Aug 2024) includes a new 345-kV substation and up to 1,000 MW of campus capacity, developable across Apple's three RTP land-bank parcels.
  • The original campus started on a 15 MW NV Energy feed and grew to a ~300 MW load; Apple previously permitted a 50 MW substation as local supply neared capacity.
  • Transmission: NV Energy's Greenlink Nevada adds three 345-kV lines from Yerington into the Reno / Innovation Park area (two to the Reno-Tahoe Industrial Center, one to the Mira Loma substation); Greenlink West (525 kV) is expected online ~mid-2027.
  • Renewable supply: Apple runs the campus on 100% renewable power via NV Energy green tariffs and dedicated solar — Turquoise Solar (50 MW AC / 61 MWdc, inside the park) and Fort Churchill Solar (19.9 MW AC, near Yerington).

Map and Nearby Locations

This Facility
Apple Sites
Nearby Facilities

Sites within 15 miles of Hub BetaInterested in this information?Contact us

Distance Site About
0.52 miles PointInterested in this information?Contact us
0.76 miles Core TowerInterested in this information?Contact us
Apple expanded its Reno Data Center Campus with a second phase that added approximately 400,000-square-foot data centers in Sparks, Nevada.
1.20 miles Hub UltraInterested in this information?Contact us
Apple expanded its Reno Data Center Campus with a third phase that added approximately 400,000-square-foot data centers in Sparks, Nevada.
1.30 miles CampusInterested in this information?Contact us
Apple has acquired 470 acres of land next to its Reno data center campus for future developments.
2.41 miles Global PointInterested in this information?Contact us
Apple has acquired 298 acres of land next to its Reno data center campus for future developments.
3.02 miles PowerHouse: Reno 3
This facility is a part of PowerHouse Reno Campus in Nevada.
3.04 miles PowerHouse: Reno 2
This facility is a part of PowerHouse Reno Campus in Nevada.
3.20 miles Tract: Peru Ridge
Tract acquires an additional 517 acres in Reno, Nevada next to its existing project, Peru Shelf Technology Park.
3.29 miles PowerHouse Reno
PowerHouse Data Centers operates a premier data center campus situated outside Reno, Nevada.
3.81 miles Vantage: NV14
3.83 miles Vantage: NV13
3.96 miles Tract: Peru Shelf Technology Park
Tract, a developer of data center parks, has commenced construction on its Peru Shelf Technology Park project in Storey County.
4.14 miles Vantage: NV12
Vantage Data Centers is expanding its footprint with a new campus development near Reno, Nevada.
4.16 miles Vantage: NV11
Vantage Data Centers is expanding its footprint with a new campus development near Reno, Nevada.
4.38 miles NOVVA Tahoe Reno
The facility includes six data halls across 300,000 sq ft (28,870 sqm) and a dedicated on-site 100MW N+1 substation from NV Energy.
4.55 miles Colovore: Reno, NV
Colovore's liquid-cooled colocation data center is located in Reno, Nevada.
4.76 miles EdgeCore Reno
5.09 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
5.25 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
5.31 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
5.44 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
5.47 miles Carrier-Neutral Data CenterInterested in this information?Contact us
5.64 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
5.93 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
6.06 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
6.72 miles Tract: Virginia Highlands Expansion
6.78 miles Tract: Virginia Highlands
Tract has expanded its data center development footprint in Reno, Nevada, with the acquisition of an additional 8,590 acres.
8.11 miles North CenterInterested in this information?Contact us
Google plans to invest more than $400 million in Storey County in 2024 alone.
10.56 miles Tract: South Valley Technology Park
Tract’s South Valley Technology Park, located seven miles southeast along USA Parkway, is a planned 1,500-acre project and can potentially support up to seven individual campuses.
13.84 miles CENTRA: 200 S Virginia (RNO01)
14.61 miles Centra: Reno 2
Centra is expanding its Reno campus with the development of RNO2, a new data center designed to support growing demand for cloud, AI, and high-density computing infrastructure in northern Nevada.
14.64 miles Lumen: Reno 1
17.20 miles Connect Data Centers: Reno, NV
US investment firm Oppidan is building a single-story, 61,554 sqft data center in Reno, Nevada. Oppidan lists Connect Data Centers as a subsidiary.
19.05 miles Tract: Silver Springs
Tract grew its Nevada footprint by acquiring roughly 1,060 acres near Silver Springs in Lyon County after securing a rezoning and development agreement.
19.95 miles Campus PlusInterested in this information?Contact us
Microsoft acquired 300.7 acres from Mark IV Capital within the 4,300-acre Victory Logistics District, a master-planned industrial hub located in Fernley, Nevada.
19.95 miles West CenterInterested in this information?Contact us
In 2025, the Lyon County Planning Commission approved a parcel map for Microsoft, allowing the company to restructure 274 acres of land it owns in Silver Springs, Nevada.

North PlazaInterested in this information?Contact us Data Center Photos See all

Operating Company

Operated by:

Apple's Move to Renewable Energy

In 2010, Apple reported that just 16% of its total facilities were powered by renewables. Within just six years, that number skyrocketed up to 96% in 2016. In 2018, Apple said that it has achieved 100% renewable energy. Source: cleantechnica.com.

As of early 2018, Apple had 25 operational renewable energy projects around the world, totaling 626 MW of generation capacity. Notably, 286 MW of solar PV generation came online in 2017. There are 15 more projects under construction that represent over 1.4 GW of renewable energy generation across 11 countries.

In Prineville, Ore., the Apple signed a 200 MW power purchase agreement for an Oregon wind farm, the Montague Wind Power Project, set to come online by the end of 2019.

Apple’s data center in Maiden, N.C., is supported by projects that generate 244 million kWh of renewable energy per year, which is equivalent to the energy used by 17,906 North Carolina homes.

29
Facilities
12
Markets
821MW
Megawatts

News See all

Read Centra Completes Structural Topping out of Reno Data Center
Centra Completes Structural Topping out of Reno Data Center

Centra Completes Structural Topping out of Reno Data Center

May 04, 2026 Reno

US data center firm Centra has topped out a new facility in Reno, Nevada. "We've officially topped out RNO2, our second Reno facility and the region's first carrier-neutral interconnection data center,” the company said on LinkedIn. “This moment represents our significant progress toward...

Read more
Read Lumen data center in Reno gets operating license 26 years after launching
Lumen data center in Reno gets operating license 26 years after launching

Lumen data center in Reno gets operating license 26 years after launching

September 23, 2025 Reno

An existing data center in Reno, Nevada, was granted a new business license to operate after going without one for nearly 20 years. The 5,925 sq ft (550 sqm) building, on a 0.28-acre site at 220 Gardner Street, was set up in 1999 by Williams Telecommunications as a telecommunications facility....

Read more
Read Greenpeace: Supply chains found to be holding big tech back from achieving sustainability goals
Greenpeace: Supply chains found to be holding big tech back from achieving  sustainability goals

Greenpeace: Supply chains found to be holding big tech back from achieving sustainability goals

November 09, 2022 Apple

Tech giants like Apple have made big pledges when it comes to going green and introducing net-zero and water-positive targets. However, when it comes to their wider supply chains, it turns out they're not so green. According to a recent report from Greenpeace, on average, 77% of technology...

Read more
Read Apple commences infrastructure improvements at Iowa data center
Apple commences infrastructure improvements at Iowa data center

Apple commences infrastructure improvements at Iowa data center

March 28, 2022 Apple

Work is finally due to commence on Apple's Iowa data center, it has been announced. Infrastructure improvements are underway on the site, and the giant is also planning to expand and connect its Viborg data center in Denmark to a district heating scheme - a data center project that was completed...

Read more
Read What is Waukee saying about Apple's data center?
What is Waukee saying about Apple's data center?

What is Waukee saying about Apple's data center?

February 14, 2022 Apple

Following the recent green light given by local planning officials on Apple’s Iowa development, a number of business people and leaders in the area have voiced their thoughts on what the development will mean for the area. Mayor Courtney Clarke outlined that in the first phase of development...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?