Data Center Campus

Vantage: Santa Clara CA2 Campus

Vantage's second Silicon Valley campus: three four-story data centers on 9 acres on Mathew Street in Santa Clara, near San Jose airport, fed by an on-site Silicon Valley Power substation. First built in 2019, with expansions through 2022.

Operational
Fully operational facility
Developed by:

Campus at a Glance

3 data centers on this campus
First built in 2019
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 37.36435, -121.9469
░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

Vantage Data Centers' second Silicon Valley campus sits on 9 acres on Mathew Street in Santa Clara, about 0.3 miles west of Norman Y. Mineta San Jose International Airport. Rail tracks bound it to the east and a Home Depot to the north. The site combines three former industrial parcels at 651, 725 and 825 Mathew Street; two were 1940s canneries. Their buildings were demolished in 2018.

Development. Vantage announced the campus in 2016 as a four-building plan, then reconfigured it into three four-story buildings totaling about 541,000 sq ft. The City of Santa Clara adopted a Mitigated Negative Declaration for the McLaren Data Center project. The California Energy Commission exempted its McLaren Backup Generating Facility (17-SPPE-01) on November 7, 2018. DPR Construction built the campus, Sheehan Nagle Hartray Architects designed it, and PASE did the structural design.

Power. Silicon Valley Power serves the campus through the on-site Parker Substation, a 100 MVA, 60 kV substation. Vantage built it to SVP standards under a 2017 agreement, and SVP owns and operates it. Vantage markets three on-site 50 MW transformers, 415/240V distribution and N+1 redundancy. Backup power comes from 50 permitted diesel generators in the 2.75 MW class, plus life-safety units. The Bay Area Air Quality Management District permitted four more 4,043 hp generators for CA23 in August 2024.

Ownership. CA21 sits in Vantage SDC, the stabilized-asset vehicle Vantage formed with DigitalBridge (then Colony Capital) in July 2020. Vantage SDC bought CA22 for $539 million in October 2021.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Vantage: CA21 Vantage Data Centers
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2019
Vantage: CA22 Vantage Data Centers
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2020
Vantage: CA23 Vantage Data Centers
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2022

Map and Nearby Locations

Vantage: Santa Clara CA2 Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

Documents

Ready to Level up Your