Data Center Campus

QTS: South Dallas DFW2 Campus

QTS's South Dallas campus covers about 265 acres off Mason Road and Belt Line Road in Wilmer, Texas, with seven two-story data center buildings filed with the state and two more planned. First building started in 2024, with buildings planned through 2028.

9 sites Dallas
Under ConstructionPlannedProspective Expansion
New facility under constructionfacility with future phases planned and prospective expansion planned
Developed by:

Campus at a Glance

9 data centers on this campus
First built in 2026 with expansions through 2028
Coordinates: 32.58282, -96.69453
░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

QTS's South Dallas campus (building code DFW2) sits in Wilmer, about 15 miles south of downtown Dallas, between Sunrise Road and Mason Road south of Belt Line Road, on the Wilmer-Lancaster city line. Stream Data Centers' DFW-B and DFW-C campuses border it to the west and north.

Land. QTS assembled about 265 acres through single-purpose LLCs between October 2023 and June 2025:

  • The Dassons 100 Addition on Belt Line Road, about 100 acres: four building lots held by QTS Dallas I DC1 to DC4 LLCs, plus a 6.3-acre infrastructure lot held by QTS Dallas Infrastructure I LLC.
  • About 113.5 acres between Sunrise Road and Mason Road (QTS Dallas II LLC, bought April 2024), split between Lancaster and Wilmer.
  • About 53.8 acres east of Mason Road on a plat named DFW2 (QTS Dallas III LLC, bought March 2024 and June 2025).

Development. QTS registered its first building with the Texas Department of Licensing and Regulation in September 2024 and had filed seven two-story buildings by April 2026. Corgan Associates and Highland Associates designed them. QTS lists South Dallas as "In Development."

Power. Oncor serves the campus. QTS holds a separate 6.3-acre lot for campus electrical infrastructure. Oncor is expanding its nearby Wilmer 138-kV substation into a 345/138-kV switchyard, adding two 345/138-kV autotransformers and two new 345-kV circuits from Watermill Switch. ERCOT's Technical Advisory Committee endorsed the $158.2 million project in January 2025. Oncor bought 62.3 acres beside the substation in November 2025.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
QTS: DFW2-DC1 QTS Data Centers
Under Construction
— — 2026
QTS: DFW2-DC2 QTS Data Centers
Under Construction
— — 2026
QTS: DFW2-DC3 QTS Data Centers
Under Construction
— — 2027
QTS: DFW2-DC4 QTS Data Centers
Under Construction
— — 2027
QTS: DFW2-DC5 QTS Data Centers
Under Construction
— — 2027
QTS: DFW2-DC6 QTS Data Centers
Under Construction
— — 2027
QTS: DFW2-DC7 QTS Data Centers
Planned
— — 2027
QTS: Dallas III QTS Data Centers
Prospective Expansion
— — 2028
QTS: DFW2 Expansion QTS Data Centers
Planned
— — 2028

Map and Nearby Locations

QTS: South Dallas DFW2 Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.

QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.

History:

  • On August 31, 2021 funds managed by Blackstone completed the acquisition of QTS Realty Trust.
  • April 30, 2019: Acquired two operating data centers in Groningen and Eemshaven, Netherlands, for approximately $44 million.
  • June 2015: QTS acquires Carpathis Hosting for $326 million. The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities.
  • July 8, 2014: Acquired the former Chicago Sun-Times printing plant for conversion to a data center.
  • June 30, 2014: Acquired the Princeton, New Jersey data center from McGraw Hill Financial.
  • 2013: Went public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2010 Acquired their Richmond facility
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2003: Company acquired its first data center in Overland Park, KS
  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas