Data Center Campus

Google: The Dalles Campus

Google's data center campus in The Dalles, Oregon, spans three Columbia River sites: the original Port of The Dalles parcel, the Taylor Lake site and the former aluminum smelter on River Road. First built in 2006, with expansions planned through 2027.

6 sites Portland
OperationalDecommissionedPlannedUnder Construction
Fully operational facility with expansion in progress and some areas decommissioned and future phases planned
Operated by:

Campus at a Glance

6 data centers on this campus
First built in 2007 with expansions through 2027
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 45.6303, -121.20344
░░░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Google's campus in The Dalles, Wasco County, Oregon, spans three nearby sites on Columbia River industrial land at the west end of the city. Google subsidiary Design LLC owns all three.

Sites

  • Original site (4200 Columbia Road). Design LLC bought about 30 acres from the Port of The Dalles in 2005 under the code name "02". It became Google's first company-owned data center in 2006. Google replaced the original electrical plant in 2012 and announced a $600 million expansion in 2013.
  • Taylor Lake (4400 River Trail Way). Design LLC bought 23 acres beside Taylor Lake from the Port in 2015, about 0.7 km north of the original site.
  • River Road (3500 River Road). Design LLC bought the 74-acre former Martin Marietta / Northwest Aluminum smelter site and Fort Dalles Rodeo grounds in March 2016, about 1 km southwest of the original site. The smelter site was an EPA Superfund cleanup site.

Power. Northern Wasco County PUD serves all three sites, mostly with BPA power. BPA's Chenoweth Substation (230/115 kV) and Discovery Substation (115 kV) sit beside the original site. BPA completed the 230 kV, breaker-and-a-half Quenett Creek Substation next to Chenoweth in 2019 for the PUD's 300 MW interconnection request. Two PUD 230 kV lines run from Quenett Creek into Google's customer-owned Taylor Lake-1 substation, and two on-site 230 kV substations feed the River Road buildings. In 2025 Google contracted more than 100 MW of the repowered Leaning Juniper IIB wind project in Gilliam County, delivered by the PUD.

Agreements and water. Long-Term Rural Enterprise Zone agreements with the City of The Dalles and Wasco County covered the first three phases. A November 2021 Strategic Investment Program agreement covers the two River Road buildings. Under the 2021 deal, Google transferred groundwater rights from the smelter site and a $28.5 million aquifer storage and recovery system to the city.

Milestones. The city approved the first River Road building in November 2022 and the second in January 2024. Google stripped one 2006 hall in 2025 and demolished it in 2026. In August 2026 the city approved a 77,000 sq ft replacement, with no tax abatement. Oregon DEQ permits the sites separately (ACDP 33-0022 "DLS", 33-0028 "TLK", 33-0061 River Road).

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Valley GammaInterested in this information?Contact us Google
Operational
░░░░ Request Dataset MW ░░░░░░ Request Dataset SqFt 2007
Ridge OneInterested in this information?Contact us Google
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2015
PrimeInterested in this information?Contact us Google
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2018
Central CampusInterested in this information?Contact us Google
Operational
░░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2024
Station PrimeInterested in this information?Contact us Google
DecommissionedPlanned
— — 2025
Point GammaInterested in this information?Contact us Google
Under Construction
— — 2026

Map and Nearby Locations

Google: The Dalles Campus Power Growth Over Time

+83% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News

Read Residents of The Dalles, Oregon gain access to Google's water consumption data following lawsuit settlement
Residents of The Dalles, Oregon gain access to Google's water consumption data following lawsuit settlement

Residents of The Dalles, Oregon gain access to Google's water consumption data following lawsuit settlement

January 03, 2023 Hyperscale Data Center

Those living in drought-prone The Dalles, Oregon, home to Google’s massive data centers, now know how much water the giant has consumed. This information, previously kept a secret by city officials, has been released following a legal fight funded by Google and launched by the city against The...

Read more
Read Google's 15-Year Tax Break on Oregon Data Center Expires
Google's 15-Year Tax Break on Oregon Data Center Expires

Google's 15-Year Tax Break on Oregon Data Center Expires

November 11, 2022 Hyperscale Data Center

Google has started paying property taxes at its Oregon data center- 15 years after it launched the facility. The company got a tax bill of $5.2m from Wasco County after its tax break expired. Google developed the data center in 2006. The tax bill might be small for Google, but it will...

Read more
Read More News

Ready to Level up Your
Data Center Strategy?