Data Center Campus

Aligned: Maryland Campus

5 sites Maryland
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Campus at a Glance

5 data centers on this campus
First built in 2026 with expansions through 2028
Coordinates: 39.33408, -77.47381
░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Aligned Data Centers' Maryland project has seen several shifts. Initially announced in May 2022 as the first tenant at TPG Real Estate's (formerly Quantum Loophole) campus, Aligned planned a 3.3 million square foot data center. The company withdrew in 2023 when Maryland restricted diesel generator usage. However, following regulatory changes, Aligned recommitted to the project in 2024.

In 2025, Aligned Data Centers broke ground on its data center in Frederick County, Maryland.

Power


  • 1+GW utility power available to campus, from diverse 230kV substations
  • Utility provider: FirstEnergy/Potomac Edison
  • Concurrently maintainable UPS
  • N+2 power generation
  • Redundant A+B distribution
  • Revenue-grade metering

Compliance


  • System and Organization Control (SOC) 2 Type 2
  • PCI DSS
  • HIPAA
  • HITECH
  • FISMA / NIST 800-53
  • ISO 27001:2022

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Aligned: IAD04 Bldg1 Aligned
Under Construction
— — 2026
Aligned: IAD04 Bldg2 Aligned
Under Construction
— — 2026
Aligned: IAD04 Bldg3 Aligned
Under Construction
— — 2027
Aligned: IAD04 Bldg4 Aligned
Planned
— — 2028
Aligned: IAD06 Aligned
Under Construction
— — 2027

Map and Nearby Locations

Aligned: Maryland Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?