Takanock: Project Tallmadge

Latest Podcast Borden Mowery Drive
Planned
Future facility in planning stage
Operated by:

Takanock: Project Tallmadge

Year Planned: 2029
Lot Size: 87 acres

Sites on this Campus:

Takanock is developing Project Tallmadge, a 2 million-square-foot (185,806 sqm) campus in Strasburg, Virginia. This project, located on 87 acres along Borden Mowery Drive in Shenandoah County, will feature two-story buildings.

Initial planning and site work began in 2024, with construction potentially commencing in late 2027 and aiming for completion around 2030.

Map and Nearby Locations

Borden Mowery Drive
Takanock Sites
Nearby Facilities

Takanock: Project Tallmadge Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Takanock: Project Tallmadge

Distance Site About
0.13 miles Takanock: Tallmadge 2
This facility is part of Project Tallmadge, to be built in Strasburg, Virginia.
3.59 miles Middletown Data Center

Operating Company

Operated by:

Founded in early 2023, Takanock is a stealth-mode company focused on solving the looming power shortage in the data center industry. Takanock has developed a patent-pending data center design, enabling utilization of backup generators as flexible grid resources without jeopardizing reliability during periods of grid outages.

To help encourage the adoption of the Takanock design, has evolved into a "tip-of-the-spear" data center developer. Since the beginning of 2024, Takanock has assembled a portfolio of sites across the United States and is in the process of permitting and entitling these sites for use as data centers. Once shovel-ready, Takanock will sell these sites to data center operators looking to build, own and operate the next generation of digital infrastructure.

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?