Go to PodcastTakanock is developing Project Tallmadge, a 2 million-square-foot (185,806 sqm) campus in Strasburg, Virginia. This project, located on 87 acres along Borden Mowery Drive in Shenandoah County, will feature two-story buildings.
Initial planning and site work began in 2024, with construction potentially commencing in late 2027 and aiming for completion around 2030.
| Distance | Site | About |
|---|---|---|
| 0.13 miles | Takanock: Tallmadge 2 |
This facility is part of Project Tallmadge, to be built in Strasburg, Virginia.
|
| 3.59 miles | Middletown Data Center |
|
Founded in early 2023, Takanock is a stealth-mode company focused on solving the looming power shortage in the data center industry. Takanock has developed a patent-pending data center design, enabling utilization of backup generators as flexible grid resources without jeopardizing reliability during periods of grid outages.
To help encourage the adoption of the Takanock design, has evolved into a "tip-of-the-spear" data center developer. Since the beginning of 2024, Takanock has assembled a portfolio of sites across the United States and is in the process of permitting and entitling these sites for use as data centers. Once shovel-ready, Takanock will sell these sites to data center operators looking to build, own and operate the next generation of digital infrastructure.