Takanock: Tallmadge 2

Latest Podcast Borden Mowery Drive
Planned
Future facility in planning stage
Operated by:

Takanock: Tallmadge 2

Short Code: Building 2
Year Planned: 2030

This facility is part of Project Tallmadge, to be built in Strasburg, Virginia.

Map and Nearby Locations

Borden Mowery Drive
Takanock Sites
Nearby Facilities

Takanock: Tallmadge 2 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Takanock: Tallmadge 2

Distance Site About
0.13 miles Takanock: Project Tallmadge
Takanock is developing Project Tallmadge, a 2 million-square-foot (185,806 sqm) campus in Strasburg, Virginia.
3.71 miles Middletown Data Center

Takanock: Tallmadge 2 Data Center Photos See all

Operating Company

Operated by:

Founded in early 2023, Takanock is a stealth-mode company focused on solving the looming power shortage in the data center industry. Takanock has developed a patent-pending data center design, enabling utilization of backup generators as flexible grid resources without jeopardizing reliability during periods of grid outages.

To help encourage the adoption of the Takanock design, has evolved into a "tip-of-the-spear" data center developer. Since the beginning of 2024, Takanock has assembled a portfolio of sites across the United States and is in the process of permitting and entitling these sites for use as data centers. Once shovel-ready, Takanock will sell these sites to data center operators looking to build, own and operate the next generation of digital infrastructure.

5
Facilities
3
Markets

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?