Middletown Data Center

Latest Podcast 8209 Valley Pike
Operational
Fully operational facility
Operated by:

Middletown Data Center

Year Built: 2019
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

11.2 MW (6.9 MW is Critical IT Load and 4.3 MW is Mechanical Supporting)

FLOOR LOAD CONFIGURATIONS

Data Hall 1a
8,256 sq. ft. raised floor (2 MW of IT)
Power & cooling density = 8.88kW / rack

Data Hall 1b
8,344 sq. ft. raised floor (2 MW of IT)
Power & cooling density = 8.88kW / rack

Data Hall 2
9,138 sq. ft. raised floor (2 MW of IT)
Power & cooling density = 8.0kW / rack

Data Hall 3
2,279 sq. ft. raised floor (169 kW of IT)

Data Hall 4
2,667 sq. ft. raised floor (169 kW of IT)

Data Hall 5
2,279 sq. ft. raised floor (380 kW of IT)
Power & cooling density = 6.33kW / rack

Data Hall 6
520 sq. ft. raised floor (25 kW of IT)

33,483 sq. ft. of total white space

Map and Nearby Locations

8209 Valley Pike
Middletown Data Center Sites
Nearby Facilities

Middletown Data Center Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Middletown Data Center

Distance Site About
3.59 miles Takanock: Tallmadge 1
Takanock is developing Project Tallmadge, a 2 million-square-foot (185,806 sqm) campus in Strasburg, Virginia.
3.71 miles Takanock: Tallmadge 2
This facility is part of Project Tallmadge, to be built in Strasburg, Virginia.
8.37 miles PowerHouse: Pacific Bldg A
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.

Middletown Data Center Data Center Photos See all

Floor configurations
Source: Baxtel
Building layout
Source: MDC

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Fluidstack Starts Construction on 99-Acre Wythe County Data Center Campus
Fluidstack has begun construction on a 99-acre data center campus at Progress Park in Wythe County, Virginia, [WDBJ reported](https://www.wdbj7.com/2026/10/29/fluidstack-hosts-open-house-wythe-coun...

Fluidstack Starts Construction on 99-Acre Wythe County Data Center Campus

November 10, 2026 Fluidstack

Fluidstack has begun construction on a 99-acre data center campus at Progress Park in Wythe County, Virginia, WDBJ reported. Wythe County is the only locality in the New River Valley with a data center under construction, WSLS reported. The campus is called Solis Arx. Wythe County and the Joint...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.