T1 Energy: Mo i Rana

Planned
Future facility in planning stage
Operated by:

T1 Energy: Mo i Rana

Year Planned: 2028
Utility Provider: Linea, Svabo Industrinett
Lot Size: 21 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size

Giga Arctic is a large industrial facility located within Mo Industripark in Mo i Rana, Rana municipality in northern Norway, held by US-listed energy company T1 Energy under a long-term lease. The building was originally constructed as a battery cell gigafactory by the company's predecessor, FREYR Battery, but construction was halted before completion and the facility has since stood unused. Local authorities have approved rezoning of part of the site for industrial or data center use, with the company holding a grid allocation from Norway's transmission system operator and a queue position for substantially more capacity, drawing on the region's hydropower resources. As of the most recent reporting, T1 Energy was in discussions with potential counterparties and no tenant, operator, or construction timeline had been confirmed.

Map and Nearby Locations

This Facility
T1 Energy Sites
Nearby Facilities

T1 Energy: Mo i Rana Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of T1 Energy: Mo i Rana

Distance Site
1.10 miles VivoPower: Mo i Rana

Operating Company

Operated by:

T1 Energy Inc. is a publicly listed energy solutions provider headquartered in Austin, Texas, trading on the New York Stock Exchange under the ticker TE, and led by Chairman and Chief Executive Officer Daniel Barcelo. The company supplies solar modules and cells, with operations in the United States, Norway, and internationally, and is focused on building an integrated domestic American supply chain for solar manufacturing. It was formerly known as FREYR Battery, a European battery gigafactory developer, before changing its name to T1 Energy in February 2025 and shifting its strategic focus from battery production to solar.

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.